Civil Engineering

COORDINATOR

Ryzhakov, Pavel

CONTACT

Office 202 – Building C2 (North Campus)
Tel.: 934 017 094
E-mail: doctorat.ec.camins@upc.edu

https://deca.upc.edu/ca/doctorat-recerca/doctorat/enginyeria-civil

Background:

Over the last 150 years, the advancement of scientific knowledge has led the field of engineering to progressively evolve from its civil and military origins, giving rise to the various areas of specialisation that exist today. In an increasingly globalised world, and especially in Europe, where a broad process of integration and convergence in higher education is under way, it makes sense for engineering to redefine its disciplines to achieve better social practice and facilitate specialised problem solving.

The current programme is heir to the doctoral courses first offered in the 1975-1976 academic year. With the passing of the Organic Law on University Reform in 1984, doctoral programmes came under the responsibility of university departments. Despite the trend towards specialisation, under a delegation agreement, the School’s teaching departments decided to maintain one cross-disciplinary doctoral programme: Civil Engineering. In recent years, the programme has coexisted with the specific programmes of the various departments. This cross-disciplinary character and the involvement of various departments is also reflected in the composition of the Doctoral Studies Committee, whose functions at the School are performed by the Research and Postgraduate Committee. The doctoral programme in Civil Engineering currently offered is an interdepartmental programme organised around six broad areas of knowledge: structural engineering and construction, geotechnical engineering, water engineering, transport engineering and regional planning, environmental engineering and sustainability, and computational engineering.

In this context, the doctoral degree in Civil Engineering offers a framework for pursuing research in the field of civil engineering, rounding out the course offering of the Barcelona School of Civil Engineering in the three cycles of higher education (bachelor’s, master's and doctoral level). The doctoral programme in Civil Engineering offered by the Barcelona School of Civil Engineering has received the Pathway to Excellence award (MEE2011-0447 – 2004, 2005, 2006, 2007, 2008, 2009, 2010, 2011, 2012, 2013).

The School’s commitment to research is also reflected in the existence of the Research and Postgraduate Studies Committee. The Committee is chaired by the assistant director of Research and Postgraduate Studies of the Barcelona School of Civil Engineering, who also acts as the coordinator of the doctoral programme. The other members of the Committee are the director of postgraduate studies; nine full-time doctoral degree-holding professors, including representatives of the School’s teaching departments and the relevant areas of knowledge (structural engineering and construction, geotechnical engineering, water engineering, transport engineering and regional planning, environmental engineering and sustainability, and computational engineering); a representative of students enrolled in the doctoral programme, appointed from among those elected to the Doctoral School Board; and the head of management services of the Barcelona School of Civil Engineering.

Over the years that it has been offered, the doctoral programme in Civil Engineering has attracted both domestic and international students. The recognition of the prestige of the Barcelona School of Civil Engineering by its students, the quality of doctoral theses produced, and the excellence of teaching and research staff have led the Spanish Ministry of Education to officially recognise the quality of the doctoral programme in successive years since 2004.

Objectives:

To complete students’ training in the topics their research will focus on. To train students in research on subjects related to civil engineering by developing their knowledge of information sources and experimental and bibliographic research tools. To introduce students to methods for making advances in engineering research by identifying unresolved problems and providing students with the knowledge and skills needed to propose solutions to them.

Rationale for the programme:

The doctoral programme in Civil Engineering is needed for two key reasons. First, the programme serves as an umbrella for cross-disciplinary research in the field of civil engineering that cannot be classified within a single specialisation (though specialised research can also be carried out within the framework of the programme). Second, the programme accommodates research topics that do not fit into any classical area, including topics related to instrumentation and experimentation, certain numerical approaches, and areas that are tangentially related to civil engineering.

The doctoral programme in Civil Engineering aims to support students in the acquisition and generation of advanced, highly specialised knowledge in the field of civil engineering in which they choose to pursue their research. To provide students with advanced training in research techniques based on scientific principles generally accepted by the scientific community. To produce doctoral theses that make a high-quality scientific contribution in the student’s area of specialisation and are of relevance in the field of civil engineering or the sciences that underpin the discipline. To disseminate the research work done through scientific publications in all areas. To develop techniques that facilitate continuous improvement with respect to projects, decision-making and the execution of works of civil engineering. To produce doctoral graduates in Engineering who are qualified to take up higher-level management positions in the productive fabric. To produce doctoral graduates who are able to make scientific contributions in their area of expertise in the immediate future and constantly acquire and renew their knowledge in order to remain at the forefront of their discipline in terms of international recognition.

Traditionally, the doctoral programme has been organised into two periods: one focusing on training and the other on research. Currently, in line with legislation in force, the period we have called “training” corresponds to the period of study to earn a master’s degree. During what we have called the “research” period, following completion of the training period, students continue their studies at the Barcelona School of Civil Engineering. In this stage, they work on a doctoral thesis based on specific lines of research, within the framework of a research group made up mainly of professors and researchers at the Barcelona School of Civil Engineering.

The doctoral programme in Civil Engineering offered by the Barcelona School of Civil Engineering provides further training in research areas related to the civil engineering profession and develops the competencies defined in the professional profile for civil engineering that require synergistic integration of knowledge and skills acquired through training in physics and mathematics and in scientific and technical fields. The programme forms part of the postgraduate course offering of the Barcelona School of Civil Engineering.


The doctoral programme in Civil Engineering enables students to pursue research aimed at improving planning, design, construction, conservation and monitoring of civil infrastructures, as well as research related to architectural constructions, urbanism and regional planning.


General information

Access profile

Given the multidisciplinary nature of the scientific field of the programme, there are a wide range of degrees that qualify applicants for admission. For the near future, the applicants considered most suitable for admission to the doctoral programme in Civil Engineering will be bachelor’s degree holders with a scientific and technological background who have completed a master's degree in Civil Engineering or one related to the scientific field of the programme (i.e. in structural engineering and construction, geotechnical and earthquake engineering, water and environmental engineering, maritime engineering, transport engineering and regional planning, environmental engineering and sustainability, or computational engineering).


In addition to having suitable academic qualifications, it is considered important that applicants have certain personal characteristics—namely, an interest in the research projects carried out within the framework of the programme; critical and analytical skills; initiative, perseverance and persistence in their academic work; the ability to work in a team; and the ability to communicate effectively, both orally and in writing.

Therefore, to gain admission to the doctoral programme in Civil Engineering for the research period of their studies, applicants must submit:
• An official master’s degree in the field of Civil Engineering. Exceptionally, applicants with a master’s degree in a related field may be considered for admission.
• A degree equivalent to a master’s degree, issued by an EHEA member country.*
• A degree issued by a country outside the EHEA (after its equivalence has been verified).*

* The degree held by an applicant must qualify them for admission to postgraduate studies in their country of origin.

Output profile

Doctoral candidates who complete a doctoral degree will have acquired the following competencies, which are needed to carry out quality research (Royal Decree 99/2011, of 28 January, which regulates official doctoral studies):

a) A systematic understanding of the field of study and a mastery of the research skills and methods related to the field.
b) An ability to conceive, design or create, put into practice and adopt a substantial process of research or creation.
c) An ability to contribute to pushing back the frontiers of knowledge through original research.
d) A capacity for critical analysis and an ability to assess and summarise new and complex ideas.
e) An ability to communicate with the academic and scientific community and with society in general as regards their fields of knowledge in the manner and languages that are typical of the international scientific community to which they belong.
f) An ability to foster scientific, technological, social, artistic and cultural progress in academic and professional contexts within a knowledge-based society.

The award of a doctoral degree must equip the graduate for work in a variety of settings, especially those requiring creativity and innovation. Doctoral graduates must have at least acquired the personal skills needed to:

a) Develop in contexts in which there is little specific information.
b) Find the key questions that must be answered to solve a complex problem.
c) Design, create, develop and undertake original, innovative projects in their field.
d) Work as part of a team and independently in an international or multidisciplinary context.
e) Integrate knowledge, deal with complexity and make judgements with limited information.
f) Offer criticism on and intellectually defend solutions.

Finally, with respect to competencies, doctoral students must:

a) have acquired advanced knowledge at the frontier of their discipline and demonstrated, in the context of internationally recognised scientific research, a deep, detailed and well-grounded understanding of theoretical and practical issues and scientific methodology in one or more research fields;
b) have made an original and significant contribution to scientific research in their field of expertise that has been recognised as such by the international scientific community;
c) have demonstrated that they are capable of designing a research project that serves as a framework for carrying out a critical analysis and assessment of imprecise situations, in which they are able to apply their contributions, expertise and working method to synthesise new and complex ideas that yield a deeper knowledge of the research context in which they work;
d) have developed sufficient autonomy to set up, manage and lead innovative research teams and projects and scientific collaborations (both national and international) within their subject area, in multidisciplinary contexts and, where appropriate, with a substantial element of knowledge transfer;
e) have demonstrated that they are able to carry out their research activity in a socially responsible manner and with scientific integrity;
f) have demonstrated that they are able to participate in scientific discussions at the international level in their field of expertise and disseminate the results of their research activity to audiences of all kinds;
g) have demonstrated, within their specific scientific context, that they are able to make cultural, social or technological advances and promote innovation in all areas within a knowledge-based society.

Number of places

15

Duration of studies and dedication regime

Duration
The maximum period of study for full-time doctoral studies is four years, counted from the date of first enrolment in the relevant programme until the date on which the doctoral thesis is deposited. The academic committee of the doctoral programme may authorise a doctoral candidate to pursue doctoral studies on a part-time basis. In this case, the maximum period of study is seven years from the date of first enrolment in the programme until the date on which the doctoral thesis is deposited. To calculate these periods, the date of deposit is considered to be the date on which the thesis is made publicly available for review.

If a doctoral candidate has a degree of disability equal to or greater than 33%, the maximum period of study is six years for full-time students and nine years for part-time students.

For full-time doctoral candidates, the minimum period of study is two years, counted from the date of an applicant's admission to the programme until the date on which the doctoral thesis is deposited; for part-time doctoral candidates it is four years.

When there are justified grounds for doing so, and the thesis supervisor and academic tutor have given their authorisation, doctoral candidates may request that the academic committee of their doctoral programme exempt them from the requirement to complete this minimum period of study.

Temporary disability leave and leave for the birth of a child, adoption or fostering for the purposes of adoption, temporary foster care, risk during pregnancy or infant feeding, gender violence and any other situation provided for in current regulations do not count towards these periods. Students who find themselves in any of these circumstances must notify the academic committee of the doctoral programme, which must inform the Doctoral School.

Doctoral candidates may request periods of temporary withdrawal from the programme for up to a total of two years. Requests must be justified and addressed to the academic committee responsible for the programme, which will decide whether or not to grant the candidate's request.

Extension of studies
If a doctoral candidate has not applied to deposit their thesis before the expiry of the deadlines specified in the previous section, the academic committee of the doctoral programme may, at the request of the doctoral candidate, authorise an extension of this deadline of one year under the conditions specified for the doctoral programme in question.

Dismissal from the doctoral programme
A doctoral candidate may be dismissed from a doctoral programme for the following reasons:

  • The doctoral candidate submitting a justified application to withdraw from the programme.
  • The doctoral candidate not having completed their annual enrolment or applied for a temporary interruption.
  • The doctoral candidate not having formalised annual enrolment on the day after the end of the authorisation to temporarily interrupt or withdraw from the programme.
  • The doctoral candidate receiving a negative reassessment after the deadline set by the academic committee of the doctoral programme to remedy the deficiencies that led to a previous negative assessment.
  • The doctoral candidate having been the subject of disciplinary proceedings leading to their suspension or permanent exclusion from the UPC.
  • A refusal to authorise the extensions applied for, in accordance with the provisions of Section 3.3 of these regulations.
  • The doctoral candidate not having submitted the research plan in the period established in Section 8.2 of these regulations.
  • The maximum period of study for the doctoral degree having ended, in accordance with the provisions of Section 3.4 of these regulations.

Dismissal from the programme means that the doctoral candidate cannot continue studying at the UPC and that their academic record will be closed. This notwithstanding, they may apply to the academic committee of the programme for readmission, and the committee must reevaluate the candidate in accordance with the criteria established in the regulations.

A doctoral candidate who has been dismissed due to having exceeded the time limit for completing doctoral studies or due to an unsatisfactory assessment may not be Academic Regulations for Doctoral Studies Universitat Politècnica de Catalunya Page 17 of 33 admitted to the same doctoral programme until at least two years have elapsed from the date of dismissal, as provided for in sections 3.4 and 9.2 of these regulations.

Legal framework

Organization

COORDINATOR:
ACADEMIC COMMISSION OF THE PROGRAM:
STRUCTURAL UNITS:
  • Barcelona School of Civil Engineering (PROMOTORA)
  • Department of Civil and Environmental Engineering
SPECIFIC URL OF THE DOCTORAL PROGRAM:
https://deca.upc.edu/ca/doctorat-recerca/doctorat/enginyeria-civil

CONTACT:

Office 202 – Building C2 (North Campus)
Tel.: 934 017 094
E-mail: doctorat.ec.camins@upc.edu


Agreements with other institutions

Research centres

Several high-level applied research centres and laboratories renowned for their excellence also carry out research and technology transfer in the field of civil engineering and the environment:

- International Centre for Numerical Methods in Engineering (CIMNE)
- Centre for Innovation in Transport (CENIT)
- International Centre for Coastal Resources Research (CIIRC)

Access, admission and registration

Access profile

Given the multidisciplinary nature of the scientific field of the programme, there are a wide range of degrees that qualify applicants for admission. For the near future, the applicants considered most suitable for admission to the doctoral programme in Civil Engineering will be bachelor’s degree holders with a scientific and technological background who have completed a master's degree in Civil Engineering or one related to the scientific field of the programme (i.e. in structural engineering and construction, geotechnical and earthquake engineering, water and environmental engineering, maritime engineering, transport engineering and regional planning, environmental engineering and sustainability, or computational engineering).


In addition to having suitable academic qualifications, it is considered important that applicants have certain personal characteristics—namely, an interest in the research projects carried out within the framework of the programme; critical and analytical skills; initiative, perseverance and persistence in their academic work; the ability to work in a team; and the ability to communicate effectively, both orally and in writing.

Therefore, to gain admission to the doctoral programme in Civil Engineering for the research period of their studies, applicants must submit:
• An official master’s degree in the field of Civil Engineering. Exceptionally, applicants with a master’s degree in a related field may be considered for admission.
• A degree equivalent to a master’s degree, issued by an EHEA member country.*
• A degree issued by a country outside the EHEA (after its equivalence has been verified).*

* The degree held by an applicant must qualify them for admission to postgraduate studies in their country of origin.

Access requirements

As a rule, applicants must hold a Spanish bachelor's degree or equivalent and a Spanish master's degree or equivalent, provided they have completed a minimum of 300 ECTS credits on the two degrees (Royal Decree 43/2015, of 2 February).

Applicants who meet one or more of the following conditions are also eligible for admission:

a) Holders of official Spanish degrees or equivalent Spanish qualifications, provided they have passed 300 ECTS credits in total and they can prove they have reached Level 3 in the Spanish Qualifications Framework for Higher Education.
b) Holders of degrees awarded in foreign education systems in the European Higher Education Area (EHEA), which do not require homologation, who can prove that they have reached Level 7 in the European Qualifications Framework, provided the degree makes the holder eligible for admission to doctoral studies in the country in which it was awarded.
c) Holders of degrees awarded in a country that does not belong to the EHEA, which do not require homologation, on the condition that the University is able to verify that the degree is of a level equivalent to that of official university master's degrees in Spain and that it makes the holder eligible for admission to doctoral studies in the country in which it was awarded.
d) Holders of another doctoral degree.
e) Holders of an official university qualification who, having been awarded a post as a trainee in the entrance examination for specialised medical training, have successfully completed at least two years of training leading to an official degree in a health sciences specialisation.

Note 1: Regulations for access to doctoral studies for individuals with degrees in bachelor's, engineering, or architecture under the system prior to the implementation of the EHEA (CG 47/02 2014).

Note 2: Agreement number 64/2014 of the Governing Council approving the procedure and criteria for assessing the academic requirements for admission to doctoral studies with non-homologated foreign degrees (CG 25/03 2014).

Legal framework

Admission criteria and merits assessment

The Doctoral Programme Committee is responsible for deciding which students are admitted to the doctoral programme in Civil Engineering based on each applicant’s curriculum vitae and how well their thesis proposal aligns with the research areas of the programme. Students may be admitted on the condition that they complete bridging courses (determined on a case-by-case basis) offered within the framework of the official postgraduate programme or other official programmes.

Before presenting their doctoral thesis, students must successfully complete any bridging courses specified as a condition for admission.

Students admitted to the doctoral programme in Civil Engineering will be attached to one of the research areas for the programme and assigned a thesis supervisor.

Admission decisions will be made based on each applicant’s curriculum vitae (with particular consideration to their academic record during the training period, ability to work in a team, and participation in research projects, conferences and publications), the degree of alignment between their doctoral thesis proposal and the research areas of the programme, and the extent to which a research group has made a commitment to fund the applicant’s work on their thesis.

All procedures related to academic administration will be governed by the UPC’s General Academic Regulations for Doctoral Studies, approved by the Office of the Vice-Rector for Research.

Admission criteria and weighting
Degrees that qualify applicants for direct admission (no bridging courses required):
• Master's degree in Civil Engineering
 • A master's degree related to the scientific field of the programme

Degrees that qualify applicants for admission subject to successful completion of bridging courses:
There is no group of degrees for which it is possible to define specific bridging courses. If the Doctoral Programme Committee decides to admit an applicant with a master's degree that is not one of those which qualify applicants for direct admission, it will specify the bridging courses that the student must complete.

In general, the Committee will base its decisions on the following criteria:
• Academic record (weighting of 60%)
• Motivation (20%)
• Knowledge of languages (10%)
• Research experience (10%)

Training complements

The academic committee for the programme may require that doctoral students pass specific bridging courses. In such cases, the committee will keep track of the bridging courses completed and establish appropriate criteria to limit their duration.

Bridging courses may provide research or cross-disciplinary training, but in no case may doctoral students be required to enrol for 60 or more ECTS credits.

Taking into account the doctoral student activity report, the academic committee for the programme may propose measures that complement those specified in these regulations and which result in doctoral students who do not meet the specified requirements being excluded from the programme.

Master’s subjects are considered bridging courses. The completion of master’s subjects—each with its own specific objectives, methods and assessment processes—will enable students to acquire the competencies defined in the second section of this document.

The degrees listed below qualify applicants for direct admission to the doctoral programme in Civil Engineering. Holders of these degrees do not need to take any bridging courses.
• Master's degree in Civil Engineering
• A master’s degree related to the scientific field of the programme

With respect to admission to the doctoral programme in Civil Engineering, there is no group of degrees for which it is possible to define specific bridging courses.

If the Doctoral Programme Committee decides to admit an applicant with a master's degree that is not one of those which qualify applicants for direct admission, it will specify the bridging courses that the student must complete.

The bridging courses required will be selected from among those included on the curriculum of the master’s degree in Civil Engineering offered by the Barcelona School of Civil Engineering.

Enrolment period for new doctoral students

Ordinary enrolment: September and October

Extraordinary enrolment: February

More information at the registration section for new doctoral students

Enrolment period

September and October

More information at the general registration section

Monitoring and evaluation of the doctoral student

Formation activities

Activity: Tutorial.
Hours: 288.
Type: compulsory.

Activity: Courses and seminars (organised within each research group, weekly).
Hours: 30.
Type: optional.

Activity: Workshops (linked to the research projects that are the framework for the doctoral student’s activity; average of one per year).
Hours: 60.
Type: optional.

Activity: Publications (by the time a doctoral student finishes their degree, it is recommended that they have three papers published in journals with impact factors).
Hours: 120.
Type: optional.

Activity: Mobility.
Hours: 480.
Type: optional.

Activity: Research plan, document preparation, preparation of public defence.
Hours: 40.
Type: compulsory.

Activity: Research methodology.
Hours: 12.
Type: optional.

Activity: Language and communication skills.
Hours: 18.
Type: optional.

Activity: Assessment based on doctoral student activity report (DAD) and research plan.
Hours: 4.
Type: compulsory.

Procedure for assignment of tutor and thesis director

The academic committee of the doctoral programme assigns a thesis supervisor to each doctoral candidate when they are admitted or enrol for the first time, taking account of the thesis supervision commitment referred to in the admission decision.

The thesis supervisor will ensure that training activities carried out by the doctoral candidate are coherent and suitable, and that the topic of the candidate’s doctoral thesis will have an impact and make a novel contribution to knowledge in the relevant field. The thesis supervisor will also guide the doctoral candidate in planning the thesis and, if necessary, tailoring it to any other projects or activities undertaken. The thesis supervisor will generally be a UPC professor or researcher who holds a doctoral degree and has documented research experience. This includes PhD-holding staff at associated schools (as determined by the Governing Council) and UPC-affiliated research institutes (in accordance with corresponding collaboration and affiliation agreements). When thesis supervisors are UPC staff members, they also act as the doctoral candidate’s tutor.

PhD holders who do not meet these criteria (as a result of their contractual relationship or the nature of the institution to which they are attached) must be approved by the UPC Doctoral School's Standing Committee in order to participate in a doctoral programme as researchers with documented research experience.

The academic committee of the doctoral programme may approve the appointment of a PhD-holding expert who is not a UPC staff member as a candidate’s thesis supervisor. In such cases, the prior authorisation of the UPC Doctoral School's Standing Committee is required. A UPC staff member who holds a doctoral degree and has documented research experience must also be proposed to act as a co-supervisor, or as the doctoral candidate’s tutor if one has not been assigned.

A thesis supervisor may step down from this role if there are justified reasons (recognised as valid by the committee) for doing so. If this occurs, the academic committee of the doctoral programme will assign the doctoral candidate a new thesis supervisor.

Provided there are justified reasons for doing so, and after hearing any relevant input from the doctoral candidate, the academic committee of the doctoral programme may assign a new thesis supervisor at any time during the period of doctoral study.

If there are academic reasons for doing so (an interdisciplinary topic, joint or international programmes, etc.) and the academic committee of the programme gives its approval, an additional thesis supervisor may be assigned. Supervisors and co-supervisors have the same responsibilities and academic recognition.

The maximum number of supervisors of a doctoral thesis is two: a supervisor and a co-supervisor.

For theses carried out under a cotutelle agreement or as part of an Industrial Doctorate, if necessary and if the agreement foresees it this maximum number of supervisors may not apply. This notwithstanding, the maximum number of supervisors belonging to the UPC is two.

More information at the PhD theses section

Permanence

The maximum period of study for full-time doctoral studies is four years, counted from the date of first enrolment in the relevant programme until the date on which the doctoral thesis is deposited. The academic committee of the doctoral programme may authorise a doctoral candidate to pursue doctoral studies on a part-time basis. In this case, the maximum period of study is seven years from the date of first enrolment in the programme until the date on which the doctoral thesis is deposited. To calculate these periods, the date of deposit is considered to be the date on which the thesis is made publicly available for review.

If a doctoral candidate has a degree of disability equal to or greater than 33%, the maximum period of study is six years for full-time students and nine years for part-time students.

If a doctoral candidate has not applied to deposit their thesis before the expiry of the deadlines specified in the previous section, the academic committee of the doctoral programme may, at the request of the doctoral candidate, authorise an extension of this deadline of one year under the conditions specified for the doctoral programme in question.

Dismissal from the doctoral programme
A doctoral candidate may be dismissed from a doctoral programme for the following reasons:

  • The doctoral candidate submitting a justified application to withdraw from the programme.
  • The doctoral candidate not having completed their annual enrolment or applied for a temporary interruption.
  • The doctoral candidate not having formalised annual enrolment on the day after the end of the authorisation to temporarily interrupt or withdraw from the programme.
  • The doctoral candidate receiving a negative reassessment after the deadline set by the academic committee of the doctoral programme to remedy the deficiencies that led to a previous negative assessment.
  • The doctoral candidate having been the subject of disciplinary proceedings leading to their suspension or permanent exclusion from the UPC.
  • A refusal to authorise the extensions applied for, in accordance with the provisions of Section 3.3 of these regulations.
  • The doctoral candidate not having submitted the research plan in the period established in Section 8.2 of these regulations.
  • The maximum period of study for the doctoral degree having ended, in accordance with the provisions of Section 3.4 of these regulations.

Dismissal from the programme means that the doctoral candidate cannot continue studying at the UPC and that their academic record will be closed. This notwithstanding, they may apply to the academic committee of the programme for readmission, and the committee must reevaluate the candidate in accordance with the criteria established in the regulations.

A doctoral candidate who has been dismissed due to having exceeded the time limit for completing doctoral studies or due to an unsatisfactory assessment may not be Academic Regulations for Doctoral Studies Universitat Politècnica de Catalunya Page 17 of 33 admitted to the same doctoral programme until at least two years have elapsed from the date of dismissal, as provided for in sections 3.4 and 9.2 of these regulations.

Legal framework

Learning resources

The Barcelona School of Civil Engineering is located on the North Campus of the Universitat Politècnica de Catalunya (UPC). The campus is also home to two other schools (the Barcelona School of Telecommunications Engineering and the Barcelona School of Informatics), the twenty teaching departments of these schools, and many research centres and other university services.


The North Campus is a modern, dynamic campus with excellent transport links. Located within the urban fabric of the city, the 147,500-m² space has a modular structure consisting of 36 buildings that house common spaces shared by all of the units based on the campus. The following is a list of shared spaces and some of the services offered at the campus:

• Wi-Fi service
• Six classroom modules
• Computer rooms
• Laboratories
• Rector Gabriel Ferraté Library
• Sports centre
• Health surveillance and promotion centre
• International Mobility Office
• Disability care programme
• Student residences
• Car parks
• Parking (Comsa)
• Student Union
• Coordination and security centre
• Shopping area
• Eateries
• Centre for Sustainability

The classrooms currently assigned to the Barcelona School of Civil Engineering are located in six of the North Campus teaching modules. These modules are used exclusively for teaching and are shared with the other schools based on the campus.

The six North Campus modules used for teaching currently have a total of 86 classrooms and two drawing rooms. They occupy 7,871 m² and have a capacity of 13,400 students (6,700 students at one time; morning and afternoon sessions). The assignment of classrooms to schools is reviewed and updated each academic year so that adjustments can be made based on the types of classroom, equipment and capacity required to deliver degree programmes. The Barcelona School of Civil Engineering currently has three assigned classroom buildings (A1, A2 and A3), which house 27 classrooms of various types with a total capacity of 1,974 students (divided between morning and afternoon sessions). All of these classrooms have video projectors, projection screens, Wi-Fi and video.


Classroom buildings on the North Campus have multipurpose spaces designed to accommodate the teaching-learning methods required for new university programmes, such as those now taught at the School. Furnishing therefore include fixed chairs with writing tablets as well as movable tables and chairs.

In addition to the teaching spaces in the classroom buildings, the Barcelona School of Civil Engineering has two classrooms located in its own buildings, with a total capacity of 150. If necessary, each of these classrooms can be split into two to create a total of four classrooms, each with a capacity of 30 to 40. These classrooms, like those in the classroom buildings, are equipped with projection screens, Wi-Fi, and video and overhead projectors.

The Barcelona School of Civil Engineering also has a study room in buildings B0 and C1.

The School has six computer classrooms with a total of 160 workstations that include audiovisual equipment (video projector and projection screen). This translates into roughly one workstation for every 16 students. All classrooms are equipped with computers with the programmes needed for the educational activities that students and professors in each degree programme must carry out. Classrooms are used for teaching and must be booked in advance by academic staff. When no teaching activity is scheduled, classrooms are freely accessible (during regular opening hours). One of the classrooms is open 24 hours a day, 7 days a week for the exclusive use of students who wish to carry out activities related to their teaching duties. This classroom is equipped with two laser printers for printing teaching materials. All workstations in computer classrooms have an internet connection. Wireless connections are available in all buildings and spaces of the Barcelona School of Civil Engineering, including classroom buildings, the library and open spaces on campus, for use by students and other members of the UPC community.

The School has specific laboratories for research and teaching in the field of civil engineering. Laboratories are located between the School’s teaching departments. Laboratories and workshops have specialised equipment for teaching purposes and for carrying out research projects linked to the Barcelona School of Civil Engineering and the doctoral degree in Civil Engineering.

Doctoral Theses

List of authorized thesis for defense

  • DEHGHANSOURAKI, DANIAL: Modeling Sediment Transport in Rivers and Reservoirs using an Accelerated Model
    Author: DEHGHANSOURAKI, DANIAL
    Thesis file: (contact the Doctoral School to confirm you have a valid doctoral degree and to get the link to the thesis)
    Programme: DOCTORAL DEGREE IN CIVIL ENGINEERING
    Department: Department of Civil and Environmental Engineering (DECA)
    Mode: Article-based thesis
    Deposit date: 04/12/2025
    Reading date: 15/01/2026
    Reading time: 12:00
    Reading place: ETSECCPB Edificio C2 -212 - Sala Conferencias Campus Nord Barcelona
    Thesis director: BLADE CASTELLET, ERNEST | LARESE DE TETTO, ANTONIA
    Thesis abstract: Reservoir sedimentation is a critical, ongoing issue in managing water resources sustainably. While conventional two-dimensional models are computationally efficient, they miss key three-dimensional processes, such as thermal stratification. Three-dimensional models provide a more accurate physical representation but require extensive computational resources, making them impractical for large-scale applications. This research creates a computational framework that combines High-Performance Computing, Artificial Intelligence, and advanced 3D multiphysics simulation to bridge this gap.A two-dimensional hydro-morphodynamic model (R-Iber) was rebuilt for Graphics Processing Units, resulting in computational speed-ups of one to two orders of magnitude. The accelerated model supported training a Deep Neural Network surrogate, enabling a 100,000-run Monte Carlo analysis for robust model calibration and uncertainty quantification. In parallel, a comprehensive three-dimensional multiphysics model was developed in the Kratos framework to simulate the 3D fluid-thermal problem.The integrated approach was used for the Riba-roja reservoir system. It measured how thermal stratification affects sediment trapping efficiency. Results show that combining HPC, AI, and multiphysics modeling leads to practical and actionable methods for sustainable reservoir management.
  • TARIN TOMAS, JUAN CARLOS: Optimización de dispositivos flexoeléctricos.
    Author: TARIN TOMAS, JUAN CARLOS
    Thesis file: (contact the Doctoral School to confirm you have a valid doctoral degree and to get the link to the thesis)
    Programme: DOCTORAL DEGREE IN CIVIL ENGINEERING
    Department: Barcelona School of Civil Engineering (ETSECCPB)
    Mode: Normal
    Deposit date: 29/10/2025
    Reading date: 30/01/2026
    Reading time: 14:30
    Reading place: UPC Campus North ETSECCPB C/ Jordi Girona 1-3 Building C1, Room 002 Barcelona
    Thesis director: ARIAS VICENTE, IRENE | GRECO, FRANCESCO
    Thesis abstract: This thesis develops a strategy to study the optimization on flexoelectric devices. There are nowadays many electromechanical devices , sensors, actuators and energy harvesters, that rely on the basis of the well-known piezoelectric effect, but not all materials exhibit this effect. The most widely used piezoelectric materials show limitations in terms of fracture toughness, toxicity, biocompatibility and temperature range of operation. A novel alternative is provided by flexoelectricity, which, unlike piezoelectricity, appears in all dielectric materials. Flexoelectricity is a size dependent electromechanical coupling which manifest itself at submicron scales and relies on the generation of field gradients inside the material. It has been recently shown, that the flexoelectric response to field gradients in the materials can be conveniently accumulated to produce a macroscopic effective piezoelectric-like response by material architecture. Through the suitable geometry of a repeating unit, piezoelectric metamaterials can be conceived to produce a net electromechanical response even when built from non-piezoelectric base materials, and thus devoid of some of the above mentioned limitations. The design of such piezoelectric metamaterials exploiting flexoelectricity poses numerous challenges both theoretical and computational. Flexoelectricity is a gradient-mediated property, and thus requires additional physical and engineering intuition beyond the homogeneous setups of piezoelectricity. The governing equations of flexoelectricity are a coupled system of fourth-order PDEs, which require solution methods beyond standard finite elements providing the required continuity. In recent work, these issues have been addressed in detail, identifying the main design concepts for piezoelectric metamaterials and developing suitable solution methods. In the present thesis, we focus on the systematic rational design of piezoelectric metamaterials and devices exploiting the flexoelectric effect. A useful tool towards this goal is topology and shape optimization with multiple and possibly conflicting objectives. An important challenge is the high-computational cost of solving flexoelectric boundary value problems in general geometries. We will thus aim at devising efficient optimization strategies to reduce the computational cost, introducing machine learning techniques to alleviate the need for detailed and accurate simulations for every design in the optimization process.

Last update: 01/01/2026 05:46:09.

List of lodged theses

  • CHASCO GOÑI, UXUE: Innovative techniques for the 3D numerical simulation of high mountain torrent flows.
    Author: CHASCO GOÑI, UXUE
    Thesis file: (contact the Doctoral School to confirm you have a valid doctoral degree and to get the link to the thesis)
    Programme: DOCTORAL DEGREE IN CIVIL ENGINEERING
    Department: Barcelona School of Civil Engineering (ETSECCPB)
    Mode: Normal
    Deposit date: 23/12/2025
    Deposit END date: 16/01/2026
    Thesis director: ROSSI BERNECOLI, RICCARDO | ZORRILLA MARTÍNEZ, RUBÉN
    Thesis abstract: This thesis develops a numerical tool for the analysis of torrential flows in high-mountain area. The formulation is based on an Eulerian two-fluid, Newtonian incompressible approach combined with a level set method for capturing the free surface.One of the main contributions of the thesis is the improvement of the mass-preserving and energy-preserving properties of Eulerian two-fluid formulations. A consistent mass source term is added to adress the intrinsic mass losses of the level-set method, and a three-step splitting strategy is introduced to guarantee the energy-preserving properties of the numerical scheme for the coupled Navier–Stokes and free-surface convection problem.The formulation is also extended to non-Newtonian rheologies, providing the capability to reproduce the more complex flow behaviours exhibited during mass flow events. A method is proposed that adapts standard CFD boundary conditions within a two-fluid framework to hydraulic flows, allowing both supercritical and subcritical regimes to be accurately captured.A black-box tool for generating three-dimensional terrain meshes is also developed, producing geometries derived from real terrain data and enabling its application to mass flow hazard scenarios.The proposed framework is validated through theoretical, experimental, and real-scale cases. Among these cases, the glacier–rock collapse in Chamoli (India, 2021) is especially significant, as it demonstrates the capability of the developed tool to reproduce a large scale torrential event and confirms its suitability for high mountain mass flow hazard analysis.

Last update: 01/01/2026 05:31:20.

List of defended theses by year

Loading...

NO RESULTS: there are no theses in this list.

Last update: 01/01/2026 06:00:09.

Theses related publications

Encara no hi ha publicacions associades a tesis d'aquest programa.

Aún no hay publicaciones asociadas a tesis de este programa.

There are no publications associated with theses from this program yet.

Research projects

START DATEEND DATEACTIVITYFINANCING ENTITY
20/12/202331/07/2025Assistència tècnica pel seguiment de la incidència de l'abocador de la Vall de Joan sobre la qualitat de les aigües de l'aqüíferARDANA CONSULTANTS S.L.U.
01/12/202330/11/2026The MARINERG-i Distributed Research Infrastructure (DRI) unites and consolidates the EU Offshore Renewable Energy (ORE) testing facilities to accelerate development and realise potential of this sectoCommission of European Communities
29/11/202331/07/2024Contrato para el desarrollo de un algoritmo de tarifación dinámica entre la Universitat Politècnica de Catalunya (UPC) y Abertis Mobility Services (AMS)ABERTIS MOBILITY SERVICES, S.L.
06/11/202303/11/2024Contrato de adjudicación de los trabajos de/'Avance en el conocimiento científico de los procesos erosivos que se se manifiestan en las márgenes de la ría del Guadalquivir y de sus soluciones”.AUTORIDAD PORTUARIA DE SEVILLA
01/10/202330/09/2027GeO and weather multi-risk impact Based Early warning and response systems supporting rapid deploYment of first respONders in EU and beyonDCommission of European Communities
01/10/202330/09/2027Unveiling Earth’s Critical Resources for Clean Energy and a Sustainable FutureCommission of European Communities
01/09/202331/08/2027Herramientas para la observación, INTERpretación y MOdelación de la INTERacción y MOvimiento multifásico en medio poroso aplicado a infraestructuras para la energía y mobilidad de las infraestructurasAGENCIA ESTATAL DE INVESTIGACION
01/09/202331/08/2026Evaluación de daños por inundación: transferencia de flujo entre calles y edificiosAGENCIA ESTATAL DE INVESTIGACION
01/09/202331/08/2026Interacción entre módulos físicos y regulatorios en la función biológica: de modelos matemáticos a biología sintéticaAGENCIA ESTATAL DE INVESTIGACION
05/07/202331/01/2025Coastal marine (pre)operational services around the Mediterranean SeaMERCATOR OCÉAN
01/06/202331/05/2024Digital Twins for Smart MobilityEUROPEAN INST OF INNOV.& TECHNOL.
31/05/202331/05/2023GPKDE
23/05/202322/06/2023Contracte de serveis per a la realització del Pla d'optimització de les extraccions i recàrrega gestionada d'àqüífers a la conca del BesòsAIGÜES DE BARCELONA EMP M GEST CI
01/05/202331/10/2026Data-driven, Integrated, Syncromodal, Collaborative and Optimised urban freight meta model for a new generation of urban logistics and planning with data sharing at European Living LabsCommission of European Communities
01/05/202330/04/2024Implementation of Low Emissions ZonesEUROPEAN INST OF INNOV.& TECHNOL.
01/03/202330/06/2023Estudio del funcionamiento hidráulico en régimen variable de la red de canales del sistema de drenaje de pluviales del Aeropuerto de Barcelona, cuencas Este y Central. Expediente DIN-359/19 para el prVIARIUM INGENIERIA SL
06/02/202305/03/2023Servei per a la realització de la redacció del Pla d'extraccions de l'aqüífer del Besòs dins l'àmbit d'influència de l'ETAP Besòs (Nº Exp.:AB/ABAST/AD/2021/08)AIGÜES DE BARCELONA EMP M GEST CI
01/02/202331/01/2025Early warning Demonstration of pan-European rainfall-induced impact forecastsEURCOM- D.G. HUMANITARIAN
24/01/202323/07/2023Contrato de servicios para la realización de los Trabajos de apoyo para el diseño del observatorio portuario del cambio climático (OPCC)ORG.PÚBLICO PUERTOS DEL ESTADO
01/01/202331/12/2025Xarxa R+D+I en Tecnologies de la Salut (Xartec Salut)AGAUR. Agència de Gestió d'Ajuts Universitaris i de Recerca
01/01/202331/12/2026CLIMAte risk and vulnerability Assessment framework and toolboXCommission of European Communities
01/01/202331/12/2027Regions for climate change resilience through Innovation, Science and TechnologyCommission of European Communities
01/01/202331/12/2025Innov. para Canal de Inv. Exp. Marítima, Multifunc/MultiescMINISTERIO DE CIENCIA E INNOVACION
01/01/202331/12/2026NEW GENERATION OF FULL ELECTRIC URBAN AND PERI-URBAN BUS RAPID TRANSIT SYSTEMS TO STRENGTHEN CLIMATE-FRIENDY MAS TRANSPORTCommission of European Communities
01/01/202331/12/202323138 INNOVATIVE DEMAND MANAGEMENT STRATEGIESEUROPEAN INST OF INNOV.& TECHNOL.
07/12/202207/12/2022MODPATH-OMP
05/12/202204/03/2023Contrato de colaboración para el apoyo técnico para la mejora de los procesos de análisis y dimensionamiento de depósitos de hormigón proyectado con armaduras postesas no adherentesPIRER TRADE, S.L.
01/12/202230/11/2024A la búsqueda de espacio de acomodación para la adaptación de la zona costera a los riesgos presentes y futurosAGENCIA ESTATAL DE INVESTIGACION
01/12/202230/11/2024Investigación experimental y modelación del crecimiento de biofilmsAGENCIA ESTATAL DE INVESTIGACION
01/12/202230/11/2024Herramientas para una mejor gestión de la basura marina en zonas costeras y acelerar la transición a una economía circular del plásticoAGENCIA ESTATAL DE INVESTIGACION
01/12/202230/11/2024ParticIpatory Technologies for sustAinable COastal monitoRing in urban Areas-HYDROAGENCIA ESTATAL DE INVESTIGACION
01/12/202230/11/2024Sistema computacional para el diagnóstico de leucemias agudas y linfomas usando imágenes de células de la sangre: prueba de concepto y plan de valorización tecnológicaAGENCIA ESTATAL DE INVESTIGACION
01/12/202230/11/2025Sistema multiescala híbrido para la predicción en el corto plazo y las proyecciones de cambio climático de la inundacíon debida a fenómenos compuestos (MyFlood)AGENCIA ESTATAL DE INVESTIGACION
01/12/202201/12/2024Towards a user-friendly and efficient open-source code Anura3D, based on the material point method for geotechnical design and analysisGobierno de España. Ministerio de Educación y Ciencia (Mec)
01/12/202230/11/2024: Participatory technologies for sustainable coastal monitoring in urban areas-HYDROGobierno de España. Ministerio de Ciencia y Tecnología. Dirección General de Programas y de Transferencia de Conocimiento (Dgptc)
01/12/202230/11/2024Computational System for the Diagnosis of Acute Leukemia and Lymphoma from Peripheral Blood Images: Proof of Concept and Roadmap for Technological ValorizationMinisteria de Ciencia e innovación
01/12/202230/11/2024Towards establishing a Digital twin for manufacturing via drop-on-demand inkjet printing.MINECO. Secretaria de Estado de Investigación, Desarrollo e Innovación.
01/11/202231/10/2025Interactive understanding of groundwater hydrology and hydrogeologyCommission of European Communities
01/11/202231/10/2026Unite! University Network for Innovation, Technology and EngineeringEuropean Commission. Education Audiovisual and Culture Agency Executive Agency (Eacea)
22/10/202220/10/2027Contrato de colaboración para la prestación del servicio/'Asistencia técnica para el seguimiento ambiental del proyecto de extracción de arenas en el sector norte de la zona II de la APB (2022-2026)/'FUNDACION AZTI-AZTI FUNDAZIOA - UNI
19/10/202218/04/2024EB-Pav: Desenvolupament d'un material amb escòries blanques per als paviments de llambordes.AGAUR. Agència de Gestió d'Ajuts Universitaris i de Recerca
19/10/202218/04/2024Posta a punt del projecte Windcrete per al prototipatgeAGAUR. Agència de Gestió d'Ajuts Universitaris i de Recerca
01/10/202230/09/2026Promoting disaster preparedness and resielence by co-developing stakeholder support tools for managing the systemic risk of compounding disasters.Commission of European Communities
01/10/202230/09/2024Fundamental study of CO2 storage through microbially enhanced carbon mineralizationCommission of European Communities
01/10/202230/09/2025DANUBIUS Implementation Phase ProjectCommission of European Communities
01/10/202230/09/2023Contrato de colaboración para el apoyo técnico en el asesoramiento en un Estudio sobre la sedimentación en el embalse de San Fernando (Salamanca)EMP.TRANSFORMACIÓN AGRARIA SA
15/09/202231/01/2023Contrato de colaboración en servicios profesionales para la Actualización del modelo hidrogeológico en el Aeropuerto de BarcelonaVIARIUM INGENIERIA SL
01/09/202231/12/2022Jornada científica: reptes en la gestió de les aigües subterrànies a l'àrea metropolitana de BarcelonaAjuntament de Barcelona
01/09/202231/08/2025Simulación in silico de la respuesta inmune del sistema glioblastoma-cerebroAGENCIA ESTATAL DE INVESTIGACION
01/09/202231/08/2025Desarrollo de sensores modulares de bajo coste para su uso en identificación estructural de puentes sometidos a cargas quasiestáticasAGENCIA ESTATAL DE INVESTIGACION
01/09/202231/08/2025Recursos hidrogeológicos en riesgo: confrontando los impactos ligados al cambio climático con el incremento de la demanda hídricaAGENCIA ESTATAL DE INVESTIGACION
01/09/202231/08/2025Enfoque interdisciplinar eficiente para anticipar la propagación de fallos en puentes que sobrepasan su vida útil. Inspección con tecnologías interoperablesAGENCIA ESTATAL DE INVESTIGACION
01/09/202231/10/2022Contrato de colaboración para el estudio hidrogeológico para analizar el impacto del soterramiento de la línea de ferrocarril sobre los acuíferos de la Vall Baixa y Delta del LlobregatACCIONA Infraesctructuras, S.A.
01/09/202231/08/2025Hydroinformatics for water resources and water related hazards management in Europe/WaterEuropeEuropean Commission
29/07/202202/12/2023Contrato de Colaboración en el comportamiento hidráulico del cruce de de la riera Païssa bajo el puente de RENFE durante la construcción de la integración del ferrocarril en Sant Feliu de LlobregatACCIONA Infraesctructuras, S.A.
01/07/202230/06/2025Securing tailings dam infrastructure with an innovative monitoring SystemEUROPEAN INST OF INNOV.& TECHNOL.
12/06/202212/04/2023Asistencia técnica para la implementación de nuevas funcionalidades en la Herramienta matemática de modelización hidrológica e hidráulica IberTECNOLOGÍAS Y SERVICIOS AGRARIOS, S.A. (TRAGSATEC)
01/06/202231/05/2023Elaboració del atles de la vulnerabilitat de la costa de Moçambic davant el canvi climàtic. Fase IICentre de Cooperació per al Desenvolupament de la UPC
01/06/202231/05/2023Trabajo de campo para la continuidad del desarrollo de la tesis doctoral “Alternative approach for water wicked problems: A socio-technical groundwater management tool to improve human developmentCentre de Cooperació per al Desenvolupament de la UPC
01/06/202231/05/2023Rehabilitant El Raval – Fase III Estudio de soluciones de bajo coste para la rehabilitación energética en hogares vulnerables – ensayo pilotoCentre de Cooperació per al Desenvolupament de la UPC
04/05/202204/05/2022Transition element for the transmission of forces between a tower and a sub-structure on a floating monolithic concrete structure for supporting marine wind turbines
02/05/202231/10/2022Contrato de colaboración para la ejecución de un nuevo ramal ferroviario en las terminales 1 y 2COMSA
28/04/202227/04/2023Contrato de colaboración para el apoyo técnico al/'Análisis de datos de la boya ANTEIA situada junto al primer quiebro del Dique de Zierbena. Año 2022/'AUTORIDAD PORTUARIA DE BILBAO
20/04/202219/06/2022Contrato de colaboración por el transporte sedimentario en el embalse de Ribarroja. 2022-GM-65CONFED. HIDROGRÁFICA DEL EBRO
01/04/202231/03/2025CONTRATO DE COLABORACIÓN PARA EL ESTUDIO DE LA DINAMICA SEDIMENTARIA DEL TRAMO FINAL DEL RÍO EBRO (ESCATRÓN - AMPOSTA). SITUACIÓN ACTUAL Y PROPUESTAS MEJORACONFED. HIDROGRÁFICA DEL EBRO
23/03/202222/05/2022Contracte de col·laboració per analitzar l'afectació de les rebaixes de tarifes promogudes des del Govern d'Andorra i el Covid19 en l'equilibri econòmic-financer de l'operador d'autobusos UTUTE COOPAL SA
04/03/202203/03/2024Intermediate filament networks: form biological function to biommetic material resilienceAGENCIA ESTATAL DE INVESTIGACION
22/02/202222/02/2022Conjunto multicapa en base cemento que puede utilizarse como soporte biológico para fachadas de edificios u otras construcciones
21/02/202221/02/2022Car-sharing agent-based simulator
01/02/202201/02/2025Millora de la capacitat predictiva dels models DS de priorització d'inversions actuals i extensió de la metodologia a la gestió d'altres actius del cicle integral de l'aiguaAGAUR. Agència de Gestió d'Ajuts Universitaris i de Recerca
05/01/202205/01/2022Method to generate the in-situ state of stress in a domain O in a geological structure
01/01/202231/03/2022CARNET Initiative on reinforcing the academic lead on Urban Mobility ProjectsFUNDACIO CENTRE D'INNOVACIO I TECNO
01/01/202231/12/202222241 Disrupting the way we move: Mobility as a ServiceEUROPEAN INST OF INNOV.& TECHNOL.
01/01/202231/12/2022New Trends on Urban MobilityEUROPEAN INST OF INNOV.& TECHNOL.
01/01/202201/03/2022Diagnóstico de la erosión de márgenes de a ría del GuadalquivirUTE MACVALNERA, SENER, TECNOAMBIENTE (Puerto de Sevilla)
01/01/202231/12/2024Anàlisi i Tecnologia d'Estructures i Materials (ATEM)AGAUR. Agència de Gestió d'Ajuts Universitaris i de Recerca; Generalitat de Catalunya. Departament de Recerca i Universitats
16/12/202131/12/2024ASESORAMIENTO PARA EL DISEÑO DE LA BARRERA REACTIVA, SISTEMA DE RECARGA Y MODELO UNIDIMENSIONAL DE TRANSPORTE REACTIVO DEL PROYECTO “LIFE MATRIXFUN.CEN. ANDALUZ INVESTIG.DEL AGUA
02/12/202101/04/2023l’ASSISTÈNCIA TÈCNICA PER A L'ADOPCIÓ DE MESURES DE MILLORA DE L'ABASTAMENT EN DUES MASSES D’AIGUA SUBTERRÀNIA SOTMESES A UNA EXPLOTACIÓ INTENSIVAARDANA CONSULTANTS S.L.U.
01/12/202130/11/2024Sistema Inteligente para el mantenimiento predictivo de diques (PI-BREAK)AGENCIA ESTATAL DE INVESTIGACION
01/12/202130/11/2023G-PFEM DE BOLSILLO: APLICACIONES DE SOFTWARE AVANZADO PARA EL PROYECTO GEOTÉCNICO DE INSTALACIONES DE ENERGIA RENOVABLE COSTA AFUERAAGENCIA ESTATAL DE INVESTIGACION
01/12/202131/08/2024Biblioteca creíble de rutinas fundamentales e interfaces para la industriaAGENCIA ESTATAL DE INVESTIGACION
01/12/202130/11/2025Reactive barriers for water renaturalization during managed aquifer recharge in the Baix Camp regionEURCOM-D.G.FOR THE ENVIRONMENT
29/11/202111/02/2022Servicios de asesoría en el proyecto y evaluación ambinetal de la optimización de la navegación en la eurovía E.60.02 GuadalquivirMC VALNERA S.L.-TECNO AMBIENTE S.L.
15/10/202131/05/2022El objeto del contrato es comprobar dos propuestas de diseño del colector Vila i Vilá que por sus características geométricas requiere de un estudio detallado en un modelo a escala reducida para valorUTE MASTER PLAN, SL - INGENIERIA GE
01/10/202131/03/2026Large scale RESToration of COASTal ecosystems through rivers to sea connectivityCommission of European Communities
01/10/202131/03/2025iCIEM 2.0: Hacia un Simulador Ambiental Integral (Lab y Obs)MINISTERIO DE CIENCIA E INNOVACION
01/10/202130/09/2024Movilidad en la ciudad del futuro. Preparar a las ciudades para la nueva movilidad 2030 a través de las 4 universidades politécnicas españolasAGENCIA ESTATAL DE INVESTIGACION
29/09/202113/12/2021ESTUDIO DE DINAMICA LITORAL PARA ANALIZAR LA INFLUENCIA DEL PORT DE COMA·RUGA EN LA ESTABILIDAD DE LAS PLAYA A PONIENTEENIGEST S.L.
01/09/202131/08/2024Vehículos autónomos urbanos: autobuses modulares y vehículos de mercancías. Diseño de nuevos servicios de movilidad e integración urbanaAGENCIA ESTATAL DE INVESTIGACION
01/09/202131/08/2024Riesgos naturales compuestos y conectados en la costa Mediterránea española ante el cambio climático - MarAGENCIA ESTATAL DE INVESTIGACION
01/09/202131/08/2024Environmental Computations and Observations for BAY SustainabilityAGENCIA ESTATAL DE INVESTIGACION
01/09/202131/08/2024Printing pattern based and MultiScale enhanced performance analysis of advanced Additive Manufacturing componentsMINECO
01/09/202131/08/2025Dinámica de sistemas celulares contráctiles guiada por adhesión intercel·lularAGENCIA ESTATAL DE INVESTIGACION
01/09/202131/08/2024Ingeniería computacional basada en simulación de aprendizaje automáticoAGENCIA ESTATAL DE INVESTIGACION
01/09/202131/08/2024Scientific Machine Learning for computational Engineering: machine learning for data-driven modelingAgencia Estatal de Investigación
28/07/202128/07/2021Cement-based multilayer assembly that can be used as a biological support for building facades or other structures
16/07/202115/08/2022Contrato de colaboración en I+D entre la Autoridad Portuaria de Baleares y la UPC para el DESARROLLO DE UN PLAN DE ADAPTACIÓN AL CAMBIO CLIMATICO PARA LOS PUERTOS DE LA AUTORIDAD PORTUARIA DE BALEARESAUTORIDAD PORTUARIA DE BALEARES
12/07/202122/06/2023Estudio Hidrogeológico correspondiente al soterramiento de las líneas R2 y R4 en Hospitalet del LlobregatUTE GPO INGENIERIA Y ARQUITECTURA S
01/07/202115/09/2021Estudio para la evaluación de la capacidad de los pasos bajo vía en la A2 y vía de servicio a su paso por el Estany de SilsBAGH TECNICA, SL
01/07/202131/12/2022Collaboration contract relating to data-driven modelsSHAOXING UNIVERSITY
17/06/202117/06/2021hiperlife
01/06/202131/05/2025Developing Optimal and Open Research Support for the Black Sea (DOORS)Commission of European Communities
01/06/202131/12/2024LATEM 4.0 - Materialización, digitalización y experimentación multinivel de estructuras mediante sistemas ciber-físicos de construcción 4.0AGENCIA ESTATAL DE INVESTIGACION
28/05/202106/09/2021Instal·lació experimental per a la certificació de cabalímetres de gran diàmetreAigües Ter-Llobregat; Consorci d’Aigües de Tarragona; Consorci Aigues Costa Brava Girona
24/05/202131/08/2021TECHNICAL SUPPORT CONTRACT AGREEMENT FOR THE PROVISION OF SPECIALIZEDKNOWLEDGE ON RIVER MORPHODYNAMICS AND ENGINEERING TO HELP PREPARINGFEASIBILITY STUDIES IN PHILIPPINE MAJOR RIVER BASINS”EGIS EAU SA
23/05/202123/05/2021Morphable sheet structure.
22/05/202122/05/2023Contracte de serveis d’assistència tècnica per a la investigació i assessorament en temes geotècnics de les infraestructures gestionades per Infraestructures de la Generalitat de Catalunya, SAU (Infraestructures.cat) i per l’ens Infraestructures Ferroviàries de Catalunya (Ifercat). Clau: E2- INF-20500Infraestructures de la Generalitat de Catalunya , S.A.U.
03/05/202103/11/2021Anàlisi de la inundabilitat del tram final de la Tordera; considerant la capacitat de transport o efectes del material llenyós, en base a les afeccions del temporal GlòriaAGÈNCIA CATALANA DE L'AIGUA
01/05/202130/04/2026Ayuda adicional RyC2019-026784-I para la ejecución de actividades de investigaciónAGENCIA ESTATAL DE INVESTIGACION
16/04/202131/12/2021Análisis del comportamiento de las playas metropolitanas al sur de Barcelona y propuesta de medidas de actuación en las playas metropolitanas.BARCELONA REG. A.M.D.U.I., S.A.
01/04/202131/03/2024IJC2019-042036-IAGENCIA ESTATAL DE INVESTIGACION
01/04/202131/03/2022EIT-UM-2021-21114- Multi-operator tool for managing Demand rEsPonsive trAnspoRTEUROPEAN INST OF INNOV.& TECHNOL.
01/04/202131/03/2022EIT-UM-2021-21169- E-ULTIMATE- Improve pUblic transport eLecTrIfication to fight against cliMATE changeEUROPEAN INST OF INNOV.& TECHNOL.
01/04/202101/07/2021Estudi dels efectes morfodinàmics de les alternatives proposades per a la desembocadura de la TorderaSENER, INGENIERÍA Y SISTEMAS, S.A.  
29/03/202130/09/2021Treballs per a l’adaptació als impactes del canvi climàtic dels ports i alguns passejos marítimsOficina Catalana del Canvi Climàtic
28/03/202128/09/2021Estudio de la evolución 2008-2020 de los depósitos sedimentarios en el embalse de Ribarroja (Zaragoza y Lleida) Clave:2020-GM-550CONFED. HIDROGRÁFICA DEL EBRO
15/03/202131/03/2023Actualización e integracion de datos en el modelo hidrogeológico. Analisis de la sensibilidad y simulación de transporte advecivo en el modelo. Revisión del modelo hidrogeológico regional. PlanteamienWESTINGHOUSE ELECTRIC SPAIN SA
15/03/202115/03/2024IGA application on crashworthiness CAE analysis including advanced plasticity and ductile fractureAGAUR. Agència de Gestió d'Ajuts Universitaris i de Recerca
15/03/202115/03/2022Model de Gestió integrada dels Recursos hídrics del Besòs davant el canvi climàtic: solucions per a l’autoabastament i resiliència del sistema hídric a l’àrea metropolitana de Barcelona (GiR-Beso`s)Ajuntament de Barcelona
10/03/202131/07/2022Servei per a la realització de la redacció del Pla d'extraccions de l'aqüífer del Besòs dins l'àmbit d'influcència de l'ETAP Besòs (Nº Exp.: AB/ABAST/AD/2021/08)AIGÜES DE BARCELONA EMP M GEST CI
01/03/202101/03/2024CODA: Next generation of industrial aerodynamic simulation codeMinisterio de Ciencia e Innovación; European Commission
01/03/202101/03/2024Enabling dynamic and Intelligent workflows in the future EuroHPCecosystem (eFlows4HPC)European Commission
08/02/202107/02/2022Avaluació de SUDS-lineals per reduir el risc d'inundació amb horitzons de CAjuntament de Barcelona
01/02/202130/06/2022trabajos de Hidrogeología necesarios para analizar el impacto de la construcción de un túnel artificial que atraviesa el acuífero superior del Delta del Llobregat y diseñar las medidas correctoras necAPIA XXI SA
26/01/202126/01/2021Floating structure for supporting a marine wind turbine
25/01/202112/03/2021Ensayos a escala reducida en el canal CIEM para determinar el comportamiento de un nuevo tipo de diques hinchables desarrollados por CIMNE como elemento disipador de energía.CENTRE INTERNACIONAL DE METODES NUM
22/01/202121/01/2022/'MANAGEMENT MODEL OF AN ELECTRIC CAR-SHARING SYSTEM: Phase 1.5 - Disaggregate modeling using an agent based simulation/'.FUNDACIO C INNOVACIO I TEC CIT UPC
04/01/202103/06/2021The main objective of the project is to identify the key concepts of UCC that will affect the profitability of stakeholders in the design, built and operation of Urban Hubs or Urban Consolidation.FUNDACIO C INNOVACIO I TEC CIT UPC
01/01/202131/12/2022EIT- UM- 2021- 21254- Planning admission and MarketingEUROPEAN INST OF INNOV.& TECHNOL.
01/01/202131/12/2021Boosting Innovation and Entrepreneurship Challenge ProjectEUROPEAN INST OF INNOV.& TECHNOL.
01/01/202131/12/2022Urban Mobility- 21257 Face to face courses and materialEUROPEAN INST OF INNOV.& TECHNOL.
01/01/202131/12/2024Stability and Sensitivity Methods for Flow Control and Industrial DesignEuropean Commission
01/01/202101/07/2021Informe sobre el Projecte de restauració geomorfològica dels hàbitats de l’espai fluvial de l’aiguabarreig entre la riera de Santa Coloma i el riu TorderaENIGEST, S.L.    
01/01/202130/09/2023Aprofundir en el coneixement relatiu a l'adaptació dels ports de la Generalitat de Catalunya i els passeigs marítims a l'impacte del canvi climàticGENCAT-DEP.POL.TERR.OBR.PUB
01/01/202131/12/2024Anàlisi Numàrica i Computació científica (ANiComp)Agència de Gestió d'Ajuts Universitaris i de Recerca (Agaur)
01/01/202127/05/2022Continuïtat del Projecte d'enfortiment de capacitats agroproductives de comunitats rurals a Cochabamba i rehabilitació sostenible funcional del canal de reg Pirigallo. Definició del projecte constructiu de rehabilitació i millora del reg Pirigallo.Centre de Cooperació per al Desenvolupament de la UPC
01/01/202127/05/2022Adquisició de dades de camp (velocitat de marea i batimetria), processat i anàlisis del corrent de component oest per la futura implementació d’una instal·lació d’energia mareomotriu al nord de l’Illa de Saboga (PanamàCentre de Cooperació per al Desenvolupament de la UPC
01/01/202127/05/2022Elaboració del atles de la vulnerabilitat de la costa de Moçambic davant el canvi climàtic. Fase I: aproximació metodològica i caracterització de paràmetres fonamentals.Centre de Cooperació per al Desenvolupament de la UPC
16/12/202022/12/2023Realització d'un assaig físic al canal CIEM per a l'estudi mitjançant model físic reduït dels esforços generats per l'acció de l'onatge en situació de temporal en el Pont del Petroli de Badalona (EncàAJUNTAMENT BADALONA
01/12/202030/11/2023H2020-101004275- MObiLIty sERvices Enhanced by GALILEO & Blockchain’,/'MOLIERE/'Commission of European Communities
01/12/202031/12/2024Ampliació del contracte de col·laboració en R+D amb CIMNECENTRE INTERNACIONAL DE METODES NUM
10/11/202010/11/2020XMC
01/11/202030/11/2022Formación Doctoral en Mecanobiológía y BioingnieríaAGENCIA ESTATAL DE INVESTIGACION
01/11/202031/10/2022Emergency Risk Information and Assessments tailored for CommunitiesAGENCIA ESTATAL DE INVESTIGACION
26/10/202025/06/2021Realització d'escenaris d'inundació de costa i erosió de platges pel projecte PIMA ADAPTA COSTAS. Exped. S-689/20 (ICGC-2020-00045)Institut Cartogràfic i Geològic de Catalunya
26/10/202025/06/2021Realització d’escenaris d’inundació de costa i erosió de platges pel projecte PIMA ADAPTA COSTASInstitut Cartografic de Catalunya (ICC)
01/10/202031/03/2024Assistants for Healthy, Safe, and Productive Virtual Construction Design, Operation and Maintenance using a Digitial TwinCommission of European Communities
01/09/202031/12/2023Riego inteligente y sostenible para la gestión de arrozalesAGENCIA ESTATAL DE INVESTIGACION
27/08/202030/08/2020Evaluation of a method for the simulation of Low impedence faults in power equipmentSiemens AG
15/08/202031/12/2022Xarxa R+D+I en Tecnologies de la Salut (XarTEC SALUT)AGAUR. Agència de Gestió d'Ajuts Universitaris i de Recerca
01/08/202031/12/2020Estudio del transporte sedimentario a lo largo del vaso del embalse de Ribarroja (Zaragoza y Lleida)Confederació Hidrogràfica de l'Ebre
23/07/202022/01/2022Design tool for optimal performance in Additive Manufacturing (Add2Man)Agència de Gestió d'Ajuts Universitaris i de Recerca (Agaur)
23/07/202022/01/20223D-Crete: Desenvolupament i optimització d'un material cementici per a impressió 3DAGAUR. Agència de Gestió d'Ajuts Universitaris i de Recerca
09/07/202030/09/2020Propuesta para la redacción de Dictamen Pericial sobre la causa de los colapsos y la idoneidad de las reparaciones de la cubierta de la nave logística situada en la parcela BZ- A2.1 de la ZAL PORT-CIUCILSA, CTRO.INTERMODAL DE LOGISTICA
01/07/202031/12/2022Xarxa Fourth Industrial RevolutionAGAUR. Agència de Gestió d'Ajuts Universitaris i de Recerca
01/07/202031/12/2022ClAsifiCación de balsas frente al RiesgO POtenciaL combinando GIS y Machine LearningMinisterio de Ciencia e Innovación
01/07/202028/12/2020Análisis del impacto costero asociado a la possible ampliación de Port BalísClub Nàutic El Balís
19/06/202025/09/2020ELABORACIÓ D'UN MODEL DE DISPERSIÓ PER LES AIGÜES QUE DESEMBOQUEN PER CANAL D'ILLA DE MAR A LA BADIA DEL FANGARINST.RECERCA I TECNOLOGI.AGROALIMEN
19/06/202018/11/2020Anàlisi de les problemàtiques i primeres alternatives de solució de les platges dels municipis de Sant Adrià, Badalona i MontgatBARCELONA REG. A.M.D.U.I., S.A.
10/06/202009/04/2022herramienta de programación, basada en códigos existentes, y que permita reproducir un modelo de transporte reactivo tan complejo como el del Salar de Atacama. modelo numérico de transporte reactivoSQM Salar S.A.
01/06/202029/02/2024Fluencia y fatiga en elementos estructurales de hormigón reforzado con fibrasAGENCIA ESTATAL DE INVESTIGACION
01/06/202031/05/2025Trenes de Vehículos Autónomos y Conectados en Autopista: Modelización Microscópica y Estrategias de GestiónAGENCIA ESTATAL DE INVESTIGACION
01/06/202031/05/2024Análisis de la peligrosidad de inundación considerando vehículos y otros flotantes en zona urbanaAGENCIA ESTATAL DE INVESTIGACION
01/06/202029/02/2024Conexión entre la bio-quemo-mecánica subcelular y la dinámica activa de materiales epiteliales mediante modelización y computación multiescalaAGENCIA ESTATAL DE INVESTIGACION
01/06/202031/10/2021Bringing Digital Twins to the Edge for mass Industry 4.0 applicationsEuropean Commission
01/06/202030/11/2023Hematopatología computacional: soluciones de aprendizaje profundo para el diagnóstico de enfermedades hematológicas a partir de imágenes de células de sangre periférica.AGENCIA ESTATAL DE INVESTIGACION
01/06/202025/11/2021OSIP Remote Sensing for Marine Litter-Study SchemeESA (EUROPEAN SPACE AGENCY)
01/06/202031/05/2023Desarrollo de un sistema de monitorización estructural basado en un microinterrogador y redes neuronales.Ministerio de Ciencia e Innovación
01/06/202031/05/2023Hematología computacional: soluciones de aprendizaje profundo para el diagnóstico de enfermedades hematológicas a partir de imágenes de células de sangre periférica (CellsiMaticDeep)Ministerio de Ciencia e Innovación
24/04/202020/03/2023Ampliació del contracte de col·laboració entre HYDS i la UPC per al desenvolupament d'un sistema de predicció hidrològica: tractament de les dades hidrometeorològiquesHydrometeorological Innovative Solutions, S.L.
22/04/202031/12/2020Servei de manteniment i desenvolupament de millores del programari eina de previsió hidrometeorologia integrada (EHIMI) operatiu del Servei Meteorològic de Catalunya per l'any 2020Servei Meteorològic de Catalunya
21/04/202031/12/2020Desenvolupament d'una Eina de Suport Basada en dades clíniques per identificar pacients COVID-19 derivats a l'UCI amb Capacitat Autònoma RespiratòriaCentre de Cooperació per al Desenvolupament de la UPC
27/03/202031/12/2021Congrés VI Expanding Ocean Frontiers 2020CLIENTS DIVERSOS
24/03/202023/07/2021Elaborar un plan de adaptación a los efectos del cambio climático de los Puertos adscritos a la Comunidad Autónoma de las Illes BalearsPORTS DE LES ILLES BALEARS
12/03/202012/07/2020Asistencia técnica para la elaboración de propuestas de medidas de protección del margen izquierdo del río Eresma a su paso por Coca (Segovia)EMP.TRANSFORMACIÓN AGRARIA SA
01/03/202030/09/2020Contracte entre CIT/CARNET i UPC per al desenvolupament de recerca sobre la mobilitat com a servei a CatalunyaFUNDACIO C INNOVACIO I TEC CIT UPC
01/03/202028/02/2021Development of a low-cost and do-it-yourself hydrodynamic measurement device for monitoring oceanographic variables in developing countries.Centre de Cooperació per al Desenvolupament , UPC
01/03/202028/02/2021Dedicated communication for water management and monitoring in the high Andean area of Peru (Phase 2)Centre de Cooperació per al Desenvolupament , UPC
12/02/202012/02/2020Lattice structure with piezoelectric behavior, a force or movement sensor and an actuator containing said lattice structure
01/02/202031/01/2026Removal and Mitigation of Pollution from the Use of Pesticides: Prevention, Recycling and Resource ManagementCommission of European Communities
01/02/202030/09/2022Advanced tools for pro-active Management of Impact and Risks induced by convective Weather, Heavy Rain and Flash Foods in EuropeEURCOM- D.G. HUMANITARIAN
31/01/202031/03/2020Servei de redacció de l'estudi de propagació de l'onatge i la seva interacció amb el dic de recer al port de BlanesPORTS DE LA GENERALITAT
23/01/202022/05/2020ASSISTÈNCIA TÈCNICA PER A L'ANÀLISI DE LA CRESCUDA DEL 22-23 D'OCTUBRE AL RIU FRANCOLÍ.AGÈNCIA CATALANA DE L'AIGUA
01/01/202031/05/2022MEDIOS DE EVALUACIÓN Y ATENUACIÓN DE LOS RIESGOS COSTEROS LOCALES DEBIDOS A LOS IMPACTOS DE LOS TEMPORALESCommission of European Communities
01/01/202031/12/2020CITYTHONEUROPEAN INST OF INNOV.& TECHNOL.
01/01/202031/12/2020EIT-UM-2020-20083- Planning, admission and marketingEUROPEAN INST OF INNOV.& TECHNOL.
01/01/202031/12/2023An Advanced Circular and Agile Manufacturing Ecosystem based on rapid reconfigurable manufacturing process and individualized consumer preferencesEuropean Commission
01/01/202001/06/2020Off-Street parking floating CARsharing serviceEIT Urban Mobility
01/01/202031/12/2021Mantenimiento y conservación del patrimonio construido – MANTREDAgencia Estatal de Investigación
01/01/202031/12/2020an Off-Street parking floating CARsharing serviceEUROPEAN INST OF INNOV.& TECHNOL.
31/12/201931/12/2022Tecnologies de Làser i altra Llum (Agrupació BASE3D)Generalitat de Catalunya. Departament de Governació i Administracions Públiques
17/11/201928/02/2020Desenvolupament d'un model teòric del tipus Flexitransport que permeti parametritzar el comportament operatiu en funció de diversos escenaris (densitat) de la demanda en termes de viatges per unitatsAMTU - AG.MUNICIPIS TITULARS SERVEI
01/11/201931/12/2023Improving and Integrating European Ocean Observing and Forecasting Systems for Sustainable use of the OceansCommission of European Communities
01/11/201931/05/2022Prevención y gestión transfronteriza del riesgo asociado a deslizamientos de tierraCommission of European Communities
01/11/201930/04/2022Development of a new generation of cost-efficient polymeric fiber rebars and behaviour assessment in concrete matrices, using innovative computation proceduresSAUDI ARAMCO TECHNOLOGIES COMPANY
01/11/201931/10/2020Assistència tècnica pel seguiment de les xarxes de control d'aigües subterrànies, superficials i drenatge del Reg Segarra-GarriguesARDANA CONSULTANTS S.L.U.
01/11/201930/10/2021Elaboración de análisis, modelación y simulación computacional para determinar las causas de la rotura de la Presa I de la Mina de Corrego do Feijao en el Complejo Paraopeba el 25/01/2019Companhia Vale do Rio Doce
14/10/201914/04/2020MANAGEMENT MODEL OF AN ELECTRIC CAR-SHARING SYSTEM: Definition of an analytic macroscopic model for mixed (free-floating & station-based) car-sharing systemsFUNDACIO C INNOVACIO I TEC CIT UPC
18/09/201930/04/2020Conveni únic per encàrrecs a CARNET per a la realització d'un projecte sobre/'MARITIME SHUTTLE”FUNDACIO C INNOVACIO I TEC CIT UPC
09/09/201908/10/2019Assessorament tècnic per a l'estudi i disseny de mesures al problema d'erosió costanera del municipi de GavàBARCELONA REG. A.M.D.U.I., S.A.
01/09/201931/05/2023Cost reduction and increase performance of floating wind technologyCommission of European Communities
01/09/201901/09/2021Diagnostic methods by means of images and machine learningSIEMENS HEALTHCARE DIAGNOSTICS, S.L
05/08/201931/08/2019Development od reduced order models for the simulation of the heat transfer problemsSiemens AG
01/06/201931/12/2019TREBALL TÈCNIC PER A L’ANÀLISI DE LA HIDRODINÀMICA DE L’EMBASSAMENT DE SUSQUEDA DURANT ELS DARRERS DIES D’AGOST DE 2017GENERALITAT DE CATALUNYA
01/06/201931/05/2024European Joint Programme on Radioactive Waste ManagementCommission of European Communities
01/06/201931/05/2021Geohazards: Identification, Modelling, Preparedness, Assessment, Collaboration and TransferenceAGENCIA ESTATAL DE INVESTIGACION
01/06/201931/05/2020Guiado mecánico de la migración celularAGENCIA ESTATAL DE INVESTIGACION
01/06/201930/06/2023DEvelopment of COupled models and their VALidation against EXperiments (2023) - Task B: MAGICNational Radioactive Waste Management Agency
21/05/201921/05/2021Assistència tècnica per a la investigació i assessorament en temes geotècnics de les infraestructures gestionades per Infraestructures de la Generalitat de Catalunya, SAU (Infraestructures.cat) i per l'Ens Infraestructures Ferroviàries de Catalunya (IFERCAT). Clau: E2-INF-18500 NomInfraestructures de la Generalitat de Catalunya , S.A.U.
20/05/201931/12/20225th DualSPHysics Users WorkshopCLIENTS DIVERSOS
17/05/201931/05/2023Recarga gestionada de acuíferos: abordando los riesgos asociados a la recarga de aguas regeneradasAGENCIA ESTATAL DE INVESTIGACION
01/05/201901/02/2021Desenvolupament de façanes verdes emprant formigó de bioreceptividad milloradaAGAUR. Agència de Gestió d'Ajuts Universitaris i de Recerca
01/05/201901/09/2020Developement of Molding SolverAltair
26/04/201905/05/2020Avaluació de la implementació del projecte pilot d'Inspiring Girls en les escoles i instituts de Catalunya per a l'empoderament de les nenes i noies en el camp TIC.FUNDACIO BARCELONA MOBILE WORLD CAP
01/04/201901/07/2019Estudi del mur annex del pont de Sant PEre de Terrassa.AJUNTAMENT TERRASSA
01/04/201929/11/2019Treball tècnic per a l’anàlisi de la hidrodinàmica de l’embassament de Susqueda durant els darrers dies d’agost de 2017Cos de Mossos d'Esquadra - Generalitat de Catalunya
01/04/201931/07/2020Suez biofactorías: economía circular y sostenibilidad como argumento para la priorizaciónSuez
01/04/201930/09/2019Offer for the construction of Reduced Order Modelling infrastructure within Kratos – Application to Conjugate Heat Transfer within Kratos – Application to Conjugate Heat TransferSiemens AG
01/04/201930/09/2019SIEMENS: Offer for the exploration of a simplified contact solver within small displacement structural analysisSiemens AG
27/03/201924/12/2019Col.laboració LIM-UPC i METEOSIM per al desenvolupament de la investigació referent a l'aplicació de la eina Coastal Hazard Wheel (CHW) en diversos països costaners d'Àfrica Occidental i CamerunMETEOSIM SL
22/03/201921/03/2020SUBCONTRATACIÓ PER A LA INSTAL.LACIÓ DE DOS CORRENTÒMETRES ADCP A LA BADIA DEL FANGAR DURANT 1,5 MESOS EN EL PRIMER SEMESTRE DEL 2019, LES DADES RECOLLIDES S'UTILITZARAN EN EL MARC DEL PROJECTE SOBREINST.RECERCA I TECNOLOGI.AGROALIMEN
01/03/201901/02/2023BICISENDAS. Carril BICI: sostenible, energéticamente autosuficiente, inteligente, descontaminante, integrado y seguroFCC CONSTRUCCION, S.A.
01/03/201928/02/2023Managed Aquifer Recharge Solutions Training NetworkCommission of European Communities
01/03/201928/02/2020Execució de la segona campanya de mesures hidrodinàmiques a la Badia d’Inhambane (Moçambic) en el marc d’un projecte de col•laboració inter-universitària amb la UP-MaxixeCentre de Cooperació per al Desenvolupament , UPC
01/03/201928/02/2020Desplegament d'una xarxa LORA per a la mesura de la hidrodinàmica dels rius de la badia d'InhambaneCentre de Cooperació per al Desenvolupament , UPC
01/03/201928/02/2020Desplegament d’una xarxa LORA per a la mesura de la hidrodinàmica dels rius de la badia d’Inhambane.Centre Cooperació per al Desenvolupament
01/03/201928/02/2020Comunicación dedicada para la gestión y monitoreo del agua en zona altoandina de Perú (Fase 1)Centre Cooperació per al Desenvolupament
01/03/201928/02/2020Implementació d'una xarxa de comunicacions acadèmica a la Universidad Pedagógica de Maxixe a Moçambic.Centre Cooperació per al Desenvolupament
28/02/201928/02/2019A METHOD FOR ESTIMATING THE FRACTURED VOLUME IN A RESERVOIR DOMAIN BY INJECTING A HIGH PRESSURE FLUID
23/01/201931/05/2019El objeto del presente convenio es la asesoría científica y técnica por parte de la UPC a SENER en el desarrollo de un sistema de monitorización estructural, dando soporte a la misma en todos aquellosSENER INGENIERÍA DE SISTEMAS S.A.
14/01/201920/12/2019Estudi de la millora del drenatge superficial del jaciment arqueològic d’Els Munts, a AltafullaAgència Catalana del Patrimoni Cultural
01/01/201930/06/2024OPEN INNOVATION-RESEARCH TRANSLATION AND APPLIED KNOWLEDGE EXCHANGE IN PRACTICE THROUGH UNIVERSITY-INDUSTRY-COOPERATIONCommission of European Communities
01/01/201930/06/2022Evaluación multinivel de la vulnerabilidad sísmica y mitigación de riesgo de edificios de obra de fábrica para centros urbanos históricos resilentesAGENCIA ESTATAL DE INVESTIGACION
01/01/201930/09/2022Simulación in vivo del efecto de la pioxia y la dosis del fármaco en el crecimiento del glioblastomaAGENCIA ESTATAL DE INVESTIGACION
01/01/201930/09/2022 Modelización y computación para una nueva generación de celdas flexo-fotovoltaicas (FlexoPVComp)AGENCIA ESTATAL DE INVESTIGACION
01/01/201930/09/2022Atenuación natural de patógenos y contaminantes orgánicos en medio poroso durante operaciones de recarga gestionada de acuíferosAGENCIA ESTATAL DE INVESTIGACION
01/01/201931/12/2021 ESTUDIO DE LAS PRESAS DE SUSQUEDA, TORÁN, PINTADO, Y GESTIÓN DE CANALES para ENDESA GEEndesa Generación, S.A.
01/01/201930/09/2022TRANSferencia y desarrollo METodológico de técnicas COmposicionales para las ciencias aplicadas y la ingenieríaAGENCIA ESTATAL DE INVESTIGACION
01/01/201931/12/2021Optimización topológica de estructuras sujetas a interacción fluido-estructura.Ministerio de Ciencia e Innovación
01/01/201930/06/2022Offshore Code Comparison CollaborationUniversitat Politècnica de Catalunya
01/01/201931/12/2021Advanced Multi-scAle moDEling of coupled mass transport for improving water management in fUel cellSMinisterio de Ciencia e Innovación
01/01/201931/12/2023FE-Modelling Task Force / Task 1: Validation of thermally induced THM effects in the rock around the FE-tunnelNational Cooperative for the Disposal of Radioactive Waste
01/01/201931/12/2019EIT Urban Mobility Start-up phaseEIT Urban Mobility
01/01/201931/12/2021Master's Degree in Urban MobilityEuropean Institute for Innovation and Technology
01/01/201931/12/2021Summer schools and team buildingEuropean Institute for Innovation and Technology
01/09/201730/06/2019Contracte de serveis per a l'assistència tècnica per a la investigació i assessorament en temes geotècnics de les infraestructures de la Generalitat de CatalunyaInfraestructures de la Generalitat de Catalunya S.A.U.
01/03/201531/10/2026Assistència tècnica per a la investigació i assessorament en temes geotècnics de la línia 9 del Metro de BarcelonaInfraestructures de la Generalitat de Catalunya S.A.U.
01/02/201431/10/2026Contracte de serveis per a l'assistència tècnica per a la investigació i assessorament en temes geotècnics de la línia 9 del Metro de Barcelona i altres grans infraestructures gestionades per Infraestructures de la Generalitat de Catalunya, SAU. Clau: AT.TM-00509Infraestructures de la Generalitat de Catalunya S.A.U.
04/01/201418/04/2024Automatic Classification of Digital Images of Peripheral Blood: Application to the Initial Diagnosis of Leukemias and LymphomasFundación GOTEO
01/12/201231/10/2026Contracte de serveis per a l'assistència tècnica per a la investigació i assessorament en temes geotècnics de la línia 9 del Metro de Barcelona i altres grans infraestructures gestionades per Infraestructures de la Generalitat de Catalunya, SAU (AT.TM-00509)Infraestructures de la Generalitat de Catalunya , S.A.U.
01/09/201131/10/2026Assistència tècnica per a la investigació i assessorament en temes geotècnics de la Línia 9 del Metro de Barcelona i altres grans infraestructures gestionades per GISA (Clau: AT.TM-00509)Gestió d'Infrastructures, S.A
01/08/201031/10/2026Contracte de serveis per a I'assistència tècnica per a la investigació i assessorament en temes geotècnics de la Línia 9 del Metro de Barcelona i altres grans infraestructures gestionades per GISA. Clau: TM-00509Gestió d'Infrastructures, S.A
24/07/200930/11/2024Desarrollo de un programa de control de la calidad del agua en zonas portuarias mediante simulacion numerica y observacionesORG.PÚBLICO PUERTOS DEL ESTADO
01/03/200831/10/2026Estudi per a la investigació i assessorament en temes geotècnics de la Línia 9 del Metro de Barcelona i altres grans infraestructures gestionades per GISA. Clau: E23-TM-00509Gestió d'Infrastructures, S.A

Teaching staff and research groups

Teachers

Doctoral Programme teachers

Other teachers linked to the Doctoral Programme

Research projects

START DATEEND DATEACTIVITYFINANCING ENTITY
20/12/202331/07/2025Assistència tècnica pel seguiment de la incidència de l'abocador de la Vall de Joan sobre la qualitat de les aigües de l'aqüíferARDANA CONSULTANTS S.L.U.
01/12/202330/11/2026The MARINERG-i Distributed Research Infrastructure (DRI) unites and consolidates the EU Offshore Renewable Energy (ORE) testing facilities to accelerate development and realise potential of this sectoCommission of European Communities
29/11/202331/07/2024Contrato para el desarrollo de un algoritmo de tarifación dinámica entre la Universitat Politècnica de Catalunya (UPC) y Abertis Mobility Services (AMS)ABERTIS MOBILITY SERVICES, S.L.
06/11/202303/11/2024Contrato de adjudicación de los trabajos de/'Avance en el conocimiento científico de los procesos erosivos que se se manifiestan en las márgenes de la ría del Guadalquivir y de sus soluciones”.AUTORIDAD PORTUARIA DE SEVILLA
01/10/202330/09/2027GeO and weather multi-risk impact Based Early warning and response systems supporting rapid deploYment of first respONders in EU and beyonDCommission of European Communities
01/10/202330/09/2027Unveiling Earth’s Critical Resources for Clean Energy and a Sustainable FutureCommission of European Communities
01/09/202331/08/2027Herramientas para la observación, INTERpretación y MOdelación de la INTERacción y MOvimiento multifásico en medio poroso aplicado a infraestructuras para la energía y mobilidad de las infraestructurasAGENCIA ESTATAL DE INVESTIGACION
01/09/202331/08/2026Evaluación de daños por inundación: transferencia de flujo entre calles y edificiosAGENCIA ESTATAL DE INVESTIGACION
01/09/202331/08/2026Interacción entre módulos físicos y regulatorios en la función biológica: de modelos matemáticos a biología sintéticaAGENCIA ESTATAL DE INVESTIGACION
05/07/202331/01/2025Coastal marine (pre)operational services around the Mediterranean SeaMERCATOR OCÉAN
01/06/202331/05/2024Digital Twins for Smart MobilityEUROPEAN INST OF INNOV.& TECHNOL.
31/05/202331/05/2023GPKDE
23/05/202322/06/2023Contracte de serveis per a la realització del Pla d'optimització de les extraccions i recàrrega gestionada d'àqüífers a la conca del BesòsAIGÜES DE BARCELONA EMP M GEST CI
01/05/202331/10/2026Data-driven, Integrated, Syncromodal, Collaborative and Optimised urban freight meta model for a new generation of urban logistics and planning with data sharing at European Living LabsCommission of European Communities
01/05/202330/04/2024Implementation of Low Emissions ZonesEUROPEAN INST OF INNOV.& TECHNOL.
01/03/202330/06/2023Estudio del funcionamiento hidráulico en régimen variable de la red de canales del sistema de drenaje de pluviales del Aeropuerto de Barcelona, cuencas Este y Central. Expediente DIN-359/19 para el prVIARIUM INGENIERIA SL
06/02/202305/03/2023Servei per a la realització de la redacció del Pla d'extraccions de l'aqüífer del Besòs dins l'àmbit d'influència de l'ETAP Besòs (Nº Exp.:AB/ABAST/AD/2021/08)AIGÜES DE BARCELONA EMP M GEST CI
01/02/202331/01/2025Early warning Demonstration of pan-European rainfall-induced impact forecastsEURCOM- D.G. HUMANITARIAN
24/01/202323/07/2023Contrato de servicios para la realización de los Trabajos de apoyo para el diseño del observatorio portuario del cambio climático (OPCC)ORG.PÚBLICO PUERTOS DEL ESTADO
01/01/202331/12/2025Xarxa R+D+I en Tecnologies de la Salut (Xartec Salut)AGAUR. Agència de Gestió d'Ajuts Universitaris i de Recerca
01/01/202331/12/2026CLIMAte risk and vulnerability Assessment framework and toolboXCommission of European Communities
01/01/202331/12/2027Regions for climate change resilience through Innovation, Science and TechnologyCommission of European Communities
01/01/202331/12/2025Innov. para Canal de Inv. Exp. Marítima, Multifunc/MultiescMINISTERIO DE CIENCIA E INNOVACION
01/01/202331/12/2026NEW GENERATION OF FULL ELECTRIC URBAN AND PERI-URBAN BUS RAPID TRANSIT SYSTEMS TO STRENGTHEN CLIMATE-FRIENDY MAS TRANSPORTCommission of European Communities
01/01/202331/12/202323138 INNOVATIVE DEMAND MANAGEMENT STRATEGIESEUROPEAN INST OF INNOV.& TECHNOL.
07/12/202207/12/2022MODPATH-OMP
05/12/202204/03/2023Contrato de colaboración para el apoyo técnico para la mejora de los procesos de análisis y dimensionamiento de depósitos de hormigón proyectado con armaduras postesas no adherentesPIRER TRADE, S.L.
01/12/202230/11/2024A la búsqueda de espacio de acomodación para la adaptación de la zona costera a los riesgos presentes y futurosAGENCIA ESTATAL DE INVESTIGACION
01/12/202230/11/2024Investigación experimental y modelación del crecimiento de biofilmsAGENCIA ESTATAL DE INVESTIGACION
01/12/202230/11/2024Herramientas para una mejor gestión de la basura marina en zonas costeras y acelerar la transición a una economía circular del plásticoAGENCIA ESTATAL DE INVESTIGACION
01/12/202230/11/2024ParticIpatory Technologies for sustAinable COastal monitoRing in urban Areas-HYDROAGENCIA ESTATAL DE INVESTIGACION
01/12/202230/11/2024Sistema computacional para el diagnóstico de leucemias agudas y linfomas usando imágenes de células de la sangre: prueba de concepto y plan de valorización tecnológicaAGENCIA ESTATAL DE INVESTIGACION
01/12/202230/11/2025Sistema multiescala híbrido para la predicción en el corto plazo y las proyecciones de cambio climático de la inundacíon debida a fenómenos compuestos (MyFlood)AGENCIA ESTATAL DE INVESTIGACION
01/12/202201/12/2024Towards a user-friendly and efficient open-source code Anura3D, based on the material point method for geotechnical design and analysisGobierno de España. Ministerio de Educación y Ciencia (Mec)
01/12/202230/11/2024: Participatory technologies for sustainable coastal monitoring in urban areas-HYDROGobierno de España. Ministerio de Ciencia y Tecnología. Dirección General de Programas y de Transferencia de Conocimiento (Dgptc)
01/12/202230/11/2024Computational System for the Diagnosis of Acute Leukemia and Lymphoma from Peripheral Blood Images: Proof of Concept and Roadmap for Technological ValorizationMinisteria de Ciencia e innovación
01/12/202230/11/2024Towards establishing a Digital twin for manufacturing via drop-on-demand inkjet printing.MINECO. Secretaria de Estado de Investigación, Desarrollo e Innovación.
01/11/202231/10/2025Interactive understanding of groundwater hydrology and hydrogeologyCommission of European Communities
01/11/202231/10/2026Unite! University Network for Innovation, Technology and EngineeringEuropean Commission. Education Audiovisual and Culture Agency Executive Agency (Eacea)
22/10/202220/10/2027Contrato de colaboración para la prestación del servicio/'Asistencia técnica para el seguimiento ambiental del proyecto de extracción de arenas en el sector norte de la zona II de la APB (2022-2026)/'FUNDACION AZTI-AZTI FUNDAZIOA - UNI
19/10/202218/04/2024EB-Pav: Desenvolupament d'un material amb escòries blanques per als paviments de llambordes.AGAUR. Agència de Gestió d'Ajuts Universitaris i de Recerca
19/10/202218/04/2024Posta a punt del projecte Windcrete per al prototipatgeAGAUR. Agència de Gestió d'Ajuts Universitaris i de Recerca
01/10/202230/09/2026Promoting disaster preparedness and resielence by co-developing stakeholder support tools for managing the systemic risk of compounding disasters.Commission of European Communities
01/10/202230/09/2024Fundamental study of CO2 storage through microbially enhanced carbon mineralizationCommission of European Communities
01/10/202230/09/2025DANUBIUS Implementation Phase ProjectCommission of European Communities
01/10/202230/09/2023Contrato de colaboración para el apoyo técnico en el asesoramiento en un Estudio sobre la sedimentación en el embalse de San Fernando (Salamanca)EMP.TRANSFORMACIÓN AGRARIA SA
15/09/202231/01/2023Contrato de colaboración en servicios profesionales para la Actualización del modelo hidrogeológico en el Aeropuerto de BarcelonaVIARIUM INGENIERIA SL
01/09/202231/12/2022Jornada científica: reptes en la gestió de les aigües subterrànies a l'àrea metropolitana de BarcelonaAjuntament de Barcelona
01/09/202231/08/2025Simulación in silico de la respuesta inmune del sistema glioblastoma-cerebroAGENCIA ESTATAL DE INVESTIGACION
01/09/202231/08/2025Desarrollo de sensores modulares de bajo coste para su uso en identificación estructural de puentes sometidos a cargas quasiestáticasAGENCIA ESTATAL DE INVESTIGACION
01/09/202231/08/2025Recursos hidrogeológicos en riesgo: confrontando los impactos ligados al cambio climático con el incremento de la demanda hídricaAGENCIA ESTATAL DE INVESTIGACION
01/09/202231/08/2025Enfoque interdisciplinar eficiente para anticipar la propagación de fallos en puentes que sobrepasan su vida útil. Inspección con tecnologías interoperablesAGENCIA ESTATAL DE INVESTIGACION
01/09/202231/10/2022Contrato de colaboración para el estudio hidrogeológico para analizar el impacto del soterramiento de la línea de ferrocarril sobre los acuíferos de la Vall Baixa y Delta del LlobregatACCIONA Infraesctructuras, S.A.
01/09/202231/08/2025Hydroinformatics for water resources and water related hazards management in Europe/WaterEuropeEuropean Commission
29/07/202202/12/2023Contrato de Colaboración en el comportamiento hidráulico del cruce de de la riera Païssa bajo el puente de RENFE durante la construcción de la integración del ferrocarril en Sant Feliu de LlobregatACCIONA Infraesctructuras, S.A.
01/07/202230/06/2025Securing tailings dam infrastructure with an innovative monitoring SystemEUROPEAN INST OF INNOV.& TECHNOL.
12/06/202212/04/2023Asistencia técnica para la implementación de nuevas funcionalidades en la Herramienta matemática de modelización hidrológica e hidráulica IberTECNOLOGÍAS Y SERVICIOS AGRARIOS, S.A. (TRAGSATEC)
01/06/202231/05/2023Elaboració del atles de la vulnerabilitat de la costa de Moçambic davant el canvi climàtic. Fase IICentre de Cooperació per al Desenvolupament de la UPC
01/06/202231/05/2023Trabajo de campo para la continuidad del desarrollo de la tesis doctoral “Alternative approach for water wicked problems: A socio-technical groundwater management tool to improve human developmentCentre de Cooperació per al Desenvolupament de la UPC
01/06/202231/05/2023Rehabilitant El Raval – Fase III Estudio de soluciones de bajo coste para la rehabilitación energética en hogares vulnerables – ensayo pilotoCentre de Cooperació per al Desenvolupament de la UPC
04/05/202204/05/2022Transition element for the transmission of forces between a tower and a sub-structure on a floating monolithic concrete structure for supporting marine wind turbines
02/05/202231/10/2022Contrato de colaboración para la ejecución de un nuevo ramal ferroviario en las terminales 1 y 2COMSA
28/04/202227/04/2023Contrato de colaboración para el apoyo técnico al/'Análisis de datos de la boya ANTEIA situada junto al primer quiebro del Dique de Zierbena. Año 2022/'AUTORIDAD PORTUARIA DE BILBAO
20/04/202219/06/2022Contrato de colaboración por el transporte sedimentario en el embalse de Ribarroja. 2022-GM-65CONFED. HIDROGRÁFICA DEL EBRO
01/04/202231/03/2025CONTRATO DE COLABORACIÓN PARA EL ESTUDIO DE LA DINAMICA SEDIMENTARIA DEL TRAMO FINAL DEL RÍO EBRO (ESCATRÓN - AMPOSTA). SITUACIÓN ACTUAL Y PROPUESTAS MEJORACONFED. HIDROGRÁFICA DEL EBRO
23/03/202222/05/2022Contracte de col·laboració per analitzar l'afectació de les rebaixes de tarifes promogudes des del Govern d'Andorra i el Covid19 en l'equilibri econòmic-financer de l'operador d'autobusos UTUTE COOPAL SA
04/03/202203/03/2024Intermediate filament networks: form biological function to biommetic material resilienceAGENCIA ESTATAL DE INVESTIGACION
22/02/202222/02/2022Conjunto multicapa en base cemento que puede utilizarse como soporte biológico para fachadas de edificios u otras construcciones
21/02/202221/02/2022Car-sharing agent-based simulator
01/02/202201/02/2025Millora de la capacitat predictiva dels models DS de priorització d'inversions actuals i extensió de la metodologia a la gestió d'altres actius del cicle integral de l'aiguaAGAUR. Agència de Gestió d'Ajuts Universitaris i de Recerca
05/01/202205/01/2022Method to generate the in-situ state of stress in a domain O in a geological structure
01/01/202231/03/2022CARNET Initiative on reinforcing the academic lead on Urban Mobility ProjectsFUNDACIO CENTRE D'INNOVACIO I TECNO
01/01/202231/12/202222241 Disrupting the way we move: Mobility as a ServiceEUROPEAN INST OF INNOV.& TECHNOL.
01/01/202231/12/2022New Trends on Urban MobilityEUROPEAN INST OF INNOV.& TECHNOL.
01/01/202201/03/2022Diagnóstico de la erosión de márgenes de a ría del GuadalquivirUTE MACVALNERA, SENER, TECNOAMBIENTE (Puerto de Sevilla)
01/01/202231/12/2024Anàlisi i Tecnologia d'Estructures i Materials (ATEM)AGAUR. Agència de Gestió d'Ajuts Universitaris i de Recerca; Generalitat de Catalunya. Departament de Recerca i Universitats
16/12/202131/12/2024ASESORAMIENTO PARA EL DISEÑO DE LA BARRERA REACTIVA, SISTEMA DE RECARGA Y MODELO UNIDIMENSIONAL DE TRANSPORTE REACTIVO DEL PROYECTO “LIFE MATRIXFUN.CEN. ANDALUZ INVESTIG.DEL AGUA
02/12/202101/04/2023l’ASSISTÈNCIA TÈCNICA PER A L'ADOPCIÓ DE MESURES DE MILLORA DE L'ABASTAMENT EN DUES MASSES D’AIGUA SUBTERRÀNIA SOTMESES A UNA EXPLOTACIÓ INTENSIVAARDANA CONSULTANTS S.L.U.
01/12/202130/11/2024Sistema Inteligente para el mantenimiento predictivo de diques (PI-BREAK)AGENCIA ESTATAL DE INVESTIGACION
01/12/202130/11/2023G-PFEM DE BOLSILLO: APLICACIONES DE SOFTWARE AVANZADO PARA EL PROYECTO GEOTÉCNICO DE INSTALACIONES DE ENERGIA RENOVABLE COSTA AFUERAAGENCIA ESTATAL DE INVESTIGACION
01/12/202131/08/2024Biblioteca creíble de rutinas fundamentales e interfaces para la industriaAGENCIA ESTATAL DE INVESTIGACION
01/12/202130/11/2025Reactive barriers for water renaturalization during managed aquifer recharge in the Baix Camp regionEURCOM-D.G.FOR THE ENVIRONMENT
29/11/202111/02/2022Servicios de asesoría en el proyecto y evaluación ambinetal de la optimización de la navegación en la eurovía E.60.02 GuadalquivirMC VALNERA S.L.-TECNO AMBIENTE S.L.
15/10/202131/05/2022El objeto del contrato es comprobar dos propuestas de diseño del colector Vila i Vilá que por sus características geométricas requiere de un estudio detallado en un modelo a escala reducida para valorUTE MASTER PLAN, SL - INGENIERIA GE
01/10/202131/03/2026Large scale RESToration of COASTal ecosystems through rivers to sea connectivityCommission of European Communities
01/10/202131/03/2025iCIEM 2.0: Hacia un Simulador Ambiental Integral (Lab y Obs)MINISTERIO DE CIENCIA E INNOVACION
01/10/202130/09/2024Movilidad en la ciudad del futuro. Preparar a las ciudades para la nueva movilidad 2030 a través de las 4 universidades politécnicas españolasAGENCIA ESTATAL DE INVESTIGACION
29/09/202113/12/2021ESTUDIO DE DINAMICA LITORAL PARA ANALIZAR LA INFLUENCIA DEL PORT DE COMA·RUGA EN LA ESTABILIDAD DE LAS PLAYA A PONIENTEENIGEST S.L.
01/09/202131/08/2024Vehículos autónomos urbanos: autobuses modulares y vehículos de mercancías. Diseño de nuevos servicios de movilidad e integración urbanaAGENCIA ESTATAL DE INVESTIGACION
01/09/202131/08/2024Riesgos naturales compuestos y conectados en la costa Mediterránea española ante el cambio climático - MarAGENCIA ESTATAL DE INVESTIGACION
01/09/202131/08/2024Environmental Computations and Observations for BAY SustainabilityAGENCIA ESTATAL DE INVESTIGACION
01/09/202131/08/2024Printing pattern based and MultiScale enhanced performance analysis of advanced Additive Manufacturing componentsMINECO
01/09/202131/08/2025Dinámica de sistemas celulares contráctiles guiada por adhesión intercel·lularAGENCIA ESTATAL DE INVESTIGACION
01/09/202131/08/2024Ingeniería computacional basada en simulación de aprendizaje automáticoAGENCIA ESTATAL DE INVESTIGACION
01/09/202131/08/2024Scientific Machine Learning for computational Engineering: machine learning for data-driven modelingAgencia Estatal de Investigación
28/07/202128/07/2021Cement-based multilayer assembly that can be used as a biological support for building facades or other structures
16/07/202115/08/2022Contrato de colaboración en I+D entre la Autoridad Portuaria de Baleares y la UPC para el DESARROLLO DE UN PLAN DE ADAPTACIÓN AL CAMBIO CLIMATICO PARA LOS PUERTOS DE LA AUTORIDAD PORTUARIA DE BALEARESAUTORIDAD PORTUARIA DE BALEARES
12/07/202122/06/2023Estudio Hidrogeológico correspondiente al soterramiento de las líneas R2 y R4 en Hospitalet del LlobregatUTE GPO INGENIERIA Y ARQUITECTURA S
01/07/202115/09/2021Estudio para la evaluación de la capacidad de los pasos bajo vía en la A2 y vía de servicio a su paso por el Estany de SilsBAGH TECNICA, SL
01/07/202131/12/2022Collaboration contract relating to data-driven modelsSHAOXING UNIVERSITY
17/06/202117/06/2021hiperlife
01/06/202131/05/2025Developing Optimal and Open Research Support for the Black Sea (DOORS)Commission of European Communities
01/06/202131/12/2024LATEM 4.0 - Materialización, digitalización y experimentación multinivel de estructuras mediante sistemas ciber-físicos de construcción 4.0AGENCIA ESTATAL DE INVESTIGACION
28/05/202106/09/2021Instal·lació experimental per a la certificació de cabalímetres de gran diàmetreAigües Ter-Llobregat; Consorci d’Aigües de Tarragona; Consorci Aigues Costa Brava Girona
24/05/202131/08/2021TECHNICAL SUPPORT CONTRACT AGREEMENT FOR THE PROVISION OF SPECIALIZEDKNOWLEDGE ON RIVER MORPHODYNAMICS AND ENGINEERING TO HELP PREPARINGFEASIBILITY STUDIES IN PHILIPPINE MAJOR RIVER BASINS”EGIS EAU SA
23/05/202123/05/2021Morphable sheet structure.
22/05/202122/05/2023Contracte de serveis d’assistència tècnica per a la investigació i assessorament en temes geotècnics de les infraestructures gestionades per Infraestructures de la Generalitat de Catalunya, SAU (Infraestructures.cat) i per l’ens Infraestructures Ferroviàries de Catalunya (Ifercat). Clau: E2- INF-20500Infraestructures de la Generalitat de Catalunya , S.A.U.
03/05/202103/11/2021Anàlisi de la inundabilitat del tram final de la Tordera; considerant la capacitat de transport o efectes del material llenyós, en base a les afeccions del temporal GlòriaAGÈNCIA CATALANA DE L'AIGUA
01/05/202130/04/2026Ayuda adicional RyC2019-026784-I para la ejecución de actividades de investigaciónAGENCIA ESTATAL DE INVESTIGACION
16/04/202131/12/2021Análisis del comportamiento de las playas metropolitanas al sur de Barcelona y propuesta de medidas de actuación en las playas metropolitanas.BARCELONA REG. A.M.D.U.I., S.A.
01/04/202131/03/2024IJC2019-042036-IAGENCIA ESTATAL DE INVESTIGACION
01/04/202131/03/2022EIT-UM-2021-21114- Multi-operator tool for managing Demand rEsPonsive trAnspoRTEUROPEAN INST OF INNOV.& TECHNOL.
01/04/202131/03/2022EIT-UM-2021-21169- E-ULTIMATE- Improve pUblic transport eLecTrIfication to fight against cliMATE changeEUROPEAN INST OF INNOV.& TECHNOL.
01/04/202101/07/2021Estudi dels efectes morfodinàmics de les alternatives proposades per a la desembocadura de la TorderaSENER, INGENIERÍA Y SISTEMAS, S.A.  
29/03/202130/09/2021Treballs per a l’adaptació als impactes del canvi climàtic dels ports i alguns passejos marítimsOficina Catalana del Canvi Climàtic
28/03/202128/09/2021Estudio de la evolución 2008-2020 de los depósitos sedimentarios en el embalse de Ribarroja (Zaragoza y Lleida) Clave:2020-GM-550CONFED. HIDROGRÁFICA DEL EBRO
15/03/202131/03/2023Actualización e integracion de datos en el modelo hidrogeológico. Analisis de la sensibilidad y simulación de transporte advecivo en el modelo. Revisión del modelo hidrogeológico regional. PlanteamienWESTINGHOUSE ELECTRIC SPAIN SA
15/03/202115/03/2024IGA application on crashworthiness CAE analysis including advanced plasticity and ductile fractureAGAUR. Agència de Gestió d'Ajuts Universitaris i de Recerca
15/03/202115/03/2022Model de Gestió integrada dels Recursos hídrics del Besòs davant el canvi climàtic: solucions per a l’autoabastament i resiliència del sistema hídric a l’àrea metropolitana de Barcelona (GiR-Beso`s)Ajuntament de Barcelona
10/03/202131/07/2022Servei per a la realització de la redacció del Pla d'extraccions de l'aqüífer del Besòs dins l'àmbit d'influcència de l'ETAP Besòs (Nº Exp.: AB/ABAST/AD/2021/08)AIGÜES DE BARCELONA EMP M GEST CI
01/03/202101/03/2024CODA: Next generation of industrial aerodynamic simulation codeMinisterio de Ciencia e Innovación; European Commission
01/03/202101/03/2024Enabling dynamic and Intelligent workflows in the future EuroHPCecosystem (eFlows4HPC)European Commission
08/02/202107/02/2022Avaluació de SUDS-lineals per reduir el risc d'inundació amb horitzons de CAjuntament de Barcelona
01/02/202130/06/2022trabajos de Hidrogeología necesarios para analizar el impacto de la construcción de un túnel artificial que atraviesa el acuífero superior del Delta del Llobregat y diseñar las medidas correctoras necAPIA XXI SA
26/01/202126/01/2021Floating structure for supporting a marine wind turbine
25/01/202112/03/2021Ensayos a escala reducida en el canal CIEM para determinar el comportamiento de un nuevo tipo de diques hinchables desarrollados por CIMNE como elemento disipador de energía.CENTRE INTERNACIONAL DE METODES NUM
22/01/202121/01/2022/'MANAGEMENT MODEL OF AN ELECTRIC CAR-SHARING SYSTEM: Phase 1.5 - Disaggregate modeling using an agent based simulation/'.FUNDACIO C INNOVACIO I TEC CIT UPC
04/01/202103/06/2021The main objective of the project is to identify the key concepts of UCC that will affect the profitability of stakeholders in the design, built and operation of Urban Hubs or Urban Consolidation.FUNDACIO C INNOVACIO I TEC CIT UPC
01/01/202131/12/2022EIT- UM- 2021- 21254- Planning admission and MarketingEUROPEAN INST OF INNOV.& TECHNOL.
01/01/202131/12/2021Boosting Innovation and Entrepreneurship Challenge ProjectEUROPEAN INST OF INNOV.& TECHNOL.
01/01/202131/12/2022Urban Mobility- 21257 Face to face courses and materialEUROPEAN INST OF INNOV.& TECHNOL.
01/01/202131/12/2024Stability and Sensitivity Methods for Flow Control and Industrial DesignEuropean Commission
01/01/202101/07/2021Informe sobre el Projecte de restauració geomorfològica dels hàbitats de l’espai fluvial de l’aiguabarreig entre la riera de Santa Coloma i el riu TorderaENIGEST, S.L.    
01/01/202130/09/2023Aprofundir en el coneixement relatiu a l'adaptació dels ports de la Generalitat de Catalunya i els passeigs marítims a l'impacte del canvi climàticGENCAT-DEP.POL.TERR.OBR.PUB
01/01/202131/12/2024Anàlisi Numàrica i Computació científica (ANiComp)Agència de Gestió d'Ajuts Universitaris i de Recerca (Agaur)
01/01/202127/05/2022Continuïtat del Projecte d'enfortiment de capacitats agroproductives de comunitats rurals a Cochabamba i rehabilitació sostenible funcional del canal de reg Pirigallo. Definició del projecte constructiu de rehabilitació i millora del reg Pirigallo.Centre de Cooperació per al Desenvolupament de la UPC
01/01/202127/05/2022Adquisició de dades de camp (velocitat de marea i batimetria), processat i anàlisis del corrent de component oest per la futura implementació d’una instal·lació d’energia mareomotriu al nord de l’Illa de Saboga (PanamàCentre de Cooperació per al Desenvolupament de la UPC
01/01/202127/05/2022Elaboració del atles de la vulnerabilitat de la costa de Moçambic davant el canvi climàtic. Fase I: aproximació metodològica i caracterització de paràmetres fonamentals.Centre de Cooperació per al Desenvolupament de la UPC
16/12/202022/12/2023Realització d'un assaig físic al canal CIEM per a l'estudi mitjançant model físic reduït dels esforços generats per l'acció de l'onatge en situació de temporal en el Pont del Petroli de Badalona (EncàAJUNTAMENT BADALONA
01/12/202030/11/2023H2020-101004275- MObiLIty sERvices Enhanced by GALILEO & Blockchain’,/'MOLIERE/'Commission of European Communities
01/12/202031/12/2024Ampliació del contracte de col·laboració en R+D amb CIMNECENTRE INTERNACIONAL DE METODES NUM
10/11/202010/11/2020XMC
01/11/202030/11/2022Formación Doctoral en Mecanobiológía y BioingnieríaAGENCIA ESTATAL DE INVESTIGACION
01/11/202031/10/2022Emergency Risk Information and Assessments tailored for CommunitiesAGENCIA ESTATAL DE INVESTIGACION
26/10/202025/06/2021Realització d'escenaris d'inundació de costa i erosió de platges pel projecte PIMA ADAPTA COSTAS. Exped. S-689/20 (ICGC-2020-00045)Institut Cartogràfic i Geològic de Catalunya
26/10/202025/06/2021Realització d’escenaris d’inundació de costa i erosió de platges pel projecte PIMA ADAPTA COSTASInstitut Cartografic de Catalunya (ICC)
01/10/202031/03/2024Assistants for Healthy, Safe, and Productive Virtual Construction Design, Operation and Maintenance using a Digitial TwinCommission of European Communities
01/09/202031/12/2023Riego inteligente y sostenible para la gestión de arrozalesAGENCIA ESTATAL DE INVESTIGACION
27/08/202030/08/2020Evaluation of a method for the simulation of Low impedence faults in power equipmentSiemens AG
15/08/202031/12/2022Xarxa R+D+I en Tecnologies de la Salut (XarTEC SALUT)AGAUR. Agència de Gestió d'Ajuts Universitaris i de Recerca
01/08/202031/12/2020Estudio del transporte sedimentario a lo largo del vaso del embalse de Ribarroja (Zaragoza y Lleida)Confederació Hidrogràfica de l'Ebre
23/07/202022/01/2022Design tool for optimal performance in Additive Manufacturing (Add2Man)Agència de Gestió d'Ajuts Universitaris i de Recerca (Agaur)
23/07/202022/01/20223D-Crete: Desenvolupament i optimització d'un material cementici per a impressió 3DAGAUR. Agència de Gestió d'Ajuts Universitaris i de Recerca
09/07/202030/09/2020Propuesta para la redacción de Dictamen Pericial sobre la causa de los colapsos y la idoneidad de las reparaciones de la cubierta de la nave logística situada en la parcela BZ- A2.1 de la ZAL PORT-CIUCILSA, CTRO.INTERMODAL DE LOGISTICA
01/07/202031/12/2022Xarxa Fourth Industrial RevolutionAGAUR. Agència de Gestió d'Ajuts Universitaris i de Recerca
01/07/202031/12/2022ClAsifiCación de balsas frente al RiesgO POtenciaL combinando GIS y Machine LearningMinisterio de Ciencia e Innovación
01/07/202028/12/2020Análisis del impacto costero asociado a la possible ampliación de Port BalísClub Nàutic El Balís
19/06/202025/09/2020ELABORACIÓ D'UN MODEL DE DISPERSIÓ PER LES AIGÜES QUE DESEMBOQUEN PER CANAL D'ILLA DE MAR A LA BADIA DEL FANGARINST.RECERCA I TECNOLOGI.AGROALIMEN
19/06/202018/11/2020Anàlisi de les problemàtiques i primeres alternatives de solució de les platges dels municipis de Sant Adrià, Badalona i MontgatBARCELONA REG. A.M.D.U.I., S.A.
10/06/202009/04/2022herramienta de programación, basada en códigos existentes, y que permita reproducir un modelo de transporte reactivo tan complejo como el del Salar de Atacama. modelo numérico de transporte reactivoSQM Salar S.A.
01/06/202029/02/2024Fluencia y fatiga en elementos estructurales de hormigón reforzado con fibrasAGENCIA ESTATAL DE INVESTIGACION
01/06/202031/05/2025Trenes de Vehículos Autónomos y Conectados en Autopista: Modelización Microscópica y Estrategias de GestiónAGENCIA ESTATAL DE INVESTIGACION
01/06/202031/05/2024Análisis de la peligrosidad de inundación considerando vehículos y otros flotantes en zona urbanaAGENCIA ESTATAL DE INVESTIGACION
01/06/202029/02/2024Conexión entre la bio-quemo-mecánica subcelular y la dinámica activa de materiales epiteliales mediante modelización y computación multiescalaAGENCIA ESTATAL DE INVESTIGACION
01/06/202031/10/2021Bringing Digital Twins to the Edge for mass Industry 4.0 applicationsEuropean Commission
01/06/202030/11/2023Hematopatología computacional: soluciones de aprendizaje profundo para el diagnóstico de enfermedades hematológicas a partir de imágenes de células de sangre periférica.AGENCIA ESTATAL DE INVESTIGACION
01/06/202025/11/2021OSIP Remote Sensing for Marine Litter-Study SchemeESA (EUROPEAN SPACE AGENCY)
01/06/202031/05/2023Desarrollo de un sistema de monitorización estructural basado en un microinterrogador y redes neuronales.Ministerio de Ciencia e Innovación
01/06/202031/05/2023Hematología computacional: soluciones de aprendizaje profundo para el diagnóstico de enfermedades hematológicas a partir de imágenes de células de sangre periférica (CellsiMaticDeep)Ministerio de Ciencia e Innovación
24/04/202020/03/2023Ampliació del contracte de col·laboració entre HYDS i la UPC per al desenvolupament d'un sistema de predicció hidrològica: tractament de les dades hidrometeorològiquesHydrometeorological Innovative Solutions, S.L.
22/04/202031/12/2020Servei de manteniment i desenvolupament de millores del programari eina de previsió hidrometeorologia integrada (EHIMI) operatiu del Servei Meteorològic de Catalunya per l'any 2020Servei Meteorològic de Catalunya
21/04/202031/12/2020Desenvolupament d'una Eina de Suport Basada en dades clíniques per identificar pacients COVID-19 derivats a l'UCI amb Capacitat Autònoma RespiratòriaCentre de Cooperació per al Desenvolupament de la UPC
27/03/202031/12/2021Congrés VI Expanding Ocean Frontiers 2020CLIENTS DIVERSOS
24/03/202023/07/2021Elaborar un plan de adaptación a los efectos del cambio climático de los Puertos adscritos a la Comunidad Autónoma de las Illes BalearsPORTS DE LES ILLES BALEARS
12/03/202012/07/2020Asistencia técnica para la elaboración de propuestas de medidas de protección del margen izquierdo del río Eresma a su paso por Coca (Segovia)EMP.TRANSFORMACIÓN AGRARIA SA
01/03/202030/09/2020Contracte entre CIT/CARNET i UPC per al desenvolupament de recerca sobre la mobilitat com a servei a CatalunyaFUNDACIO C INNOVACIO I TEC CIT UPC
01/03/202028/02/2021Development of a low-cost and do-it-yourself hydrodynamic measurement device for monitoring oceanographic variables in developing countries.Centre de Cooperació per al Desenvolupament , UPC
01/03/202028/02/2021Dedicated communication for water management and monitoring in the high Andean area of Peru (Phase 2)Centre de Cooperació per al Desenvolupament , UPC
12/02/202012/02/2020Lattice structure with piezoelectric behavior, a force or movement sensor and an actuator containing said lattice structure
01/02/202031/01/2026Removal and Mitigation of Pollution from the Use of Pesticides: Prevention, Recycling and Resource ManagementCommission of European Communities
01/02/202030/09/2022Advanced tools for pro-active Management of Impact and Risks induced by convective Weather, Heavy Rain and Flash Foods in EuropeEURCOM- D.G. HUMANITARIAN
31/01/202031/03/2020Servei de redacció de l'estudi de propagació de l'onatge i la seva interacció amb el dic de recer al port de BlanesPORTS DE LA GENERALITAT
23/01/202022/05/2020ASSISTÈNCIA TÈCNICA PER A L'ANÀLISI DE LA CRESCUDA DEL 22-23 D'OCTUBRE AL RIU FRANCOLÍ.AGÈNCIA CATALANA DE L'AIGUA
01/01/202031/05/2022MEDIOS DE EVALUACIÓN Y ATENUACIÓN DE LOS RIESGOS COSTEROS LOCALES DEBIDOS A LOS IMPACTOS DE LOS TEMPORALESCommission of European Communities
01/01/202031/12/2020CITYTHONEUROPEAN INST OF INNOV.& TECHNOL.
01/01/202031/12/2020EIT-UM-2020-20083- Planning, admission and marketingEUROPEAN INST OF INNOV.& TECHNOL.
01/01/202031/12/2023An Advanced Circular and Agile Manufacturing Ecosystem based on rapid reconfigurable manufacturing process and individualized consumer preferencesEuropean Commission
01/01/202001/06/2020Off-Street parking floating CARsharing serviceEIT Urban Mobility
01/01/202031/12/2021Mantenimiento y conservación del patrimonio construido – MANTREDAgencia Estatal de Investigación
01/01/202031/12/2020an Off-Street parking floating CARsharing serviceEUROPEAN INST OF INNOV.& TECHNOL.
31/12/201931/12/2022Tecnologies de Làser i altra Llum (Agrupació BASE3D)Generalitat de Catalunya. Departament de Governació i Administracions Públiques
17/11/201928/02/2020Desenvolupament d'un model teòric del tipus Flexitransport que permeti parametritzar el comportament operatiu en funció de diversos escenaris (densitat) de la demanda en termes de viatges per unitatsAMTU - AG.MUNICIPIS TITULARS SERVEI
01/11/201931/12/2023Improving and Integrating European Ocean Observing and Forecasting Systems for Sustainable use of the OceansCommission of European Communities
01/11/201931/05/2022Prevención y gestión transfronteriza del riesgo asociado a deslizamientos de tierraCommission of European Communities
01/11/201930/04/2022Development of a new generation of cost-efficient polymeric fiber rebars and behaviour assessment in concrete matrices, using innovative computation proceduresSAUDI ARAMCO TECHNOLOGIES COMPANY
01/11/201931/10/2020Assistència tècnica pel seguiment de les xarxes de control d'aigües subterrànies, superficials i drenatge del Reg Segarra-GarriguesARDANA CONSULTANTS S.L.U.
01/11/201930/10/2021Elaboración de análisis, modelación y simulación computacional para determinar las causas de la rotura de la Presa I de la Mina de Corrego do Feijao en el Complejo Paraopeba el 25/01/2019Companhia Vale do Rio Doce
14/10/201914/04/2020MANAGEMENT MODEL OF AN ELECTRIC CAR-SHARING SYSTEM: Definition of an analytic macroscopic model for mixed (free-floating & station-based) car-sharing systemsFUNDACIO C INNOVACIO I TEC CIT UPC
18/09/201930/04/2020Conveni únic per encàrrecs a CARNET per a la realització d'un projecte sobre/'MARITIME SHUTTLE”FUNDACIO C INNOVACIO I TEC CIT UPC
09/09/201908/10/2019Assessorament tècnic per a l'estudi i disseny de mesures al problema d'erosió costanera del municipi de GavàBARCELONA REG. A.M.D.U.I., S.A.
01/09/201931/05/2023Cost reduction and increase performance of floating wind technologyCommission of European Communities
01/09/201901/09/2021Diagnostic methods by means of images and machine learningSIEMENS HEALTHCARE DIAGNOSTICS, S.L
05/08/201931/08/2019Development od reduced order models for the simulation of the heat transfer problemsSiemens AG
01/06/201931/12/2019TREBALL TÈCNIC PER A L’ANÀLISI DE LA HIDRODINÀMICA DE L’EMBASSAMENT DE SUSQUEDA DURANT ELS DARRERS DIES D’AGOST DE 2017GENERALITAT DE CATALUNYA
01/06/201931/05/2024European Joint Programme on Radioactive Waste ManagementCommission of European Communities
01/06/201931/05/2021Geohazards: Identification, Modelling, Preparedness, Assessment, Collaboration and TransferenceAGENCIA ESTATAL DE INVESTIGACION
01/06/201931/05/2020Guiado mecánico de la migración celularAGENCIA ESTATAL DE INVESTIGACION
01/06/201930/06/2023DEvelopment of COupled models and their VALidation against EXperiments (2023) - Task B: MAGICNational Radioactive Waste Management Agency
21/05/201921/05/2021Assistència tècnica per a la investigació i assessorament en temes geotècnics de les infraestructures gestionades per Infraestructures de la Generalitat de Catalunya, SAU (Infraestructures.cat) i per l'Ens Infraestructures Ferroviàries de Catalunya (IFERCAT). Clau: E2-INF-18500 NomInfraestructures de la Generalitat de Catalunya , S.A.U.
20/05/201931/12/20225th DualSPHysics Users WorkshopCLIENTS DIVERSOS
17/05/201931/05/2023Recarga gestionada de acuíferos: abordando los riesgos asociados a la recarga de aguas regeneradasAGENCIA ESTATAL DE INVESTIGACION
01/05/201901/02/2021Desenvolupament de façanes verdes emprant formigó de bioreceptividad milloradaAGAUR. Agència de Gestió d'Ajuts Universitaris i de Recerca
01/05/201901/09/2020Developement of Molding SolverAltair
26/04/201905/05/2020Avaluació de la implementació del projecte pilot d'Inspiring Girls en les escoles i instituts de Catalunya per a l'empoderament de les nenes i noies en el camp TIC.FUNDACIO BARCELONA MOBILE WORLD CAP
01/04/201901/07/2019Estudi del mur annex del pont de Sant PEre de Terrassa.AJUNTAMENT TERRASSA
01/04/201929/11/2019Treball tècnic per a l’anàlisi de la hidrodinàmica de l’embassament de Susqueda durant els darrers dies d’agost de 2017Cos de Mossos d'Esquadra - Generalitat de Catalunya
01/04/201931/07/2020Suez biofactorías: economía circular y sostenibilidad como argumento para la priorizaciónSuez
01/04/201930/09/2019Offer for the construction of Reduced Order Modelling infrastructure within Kratos – Application to Conjugate Heat Transfer within Kratos – Application to Conjugate Heat TransferSiemens AG
01/04/201930/09/2019SIEMENS: Offer for the exploration of a simplified contact solver within small displacement structural analysisSiemens AG
27/03/201924/12/2019Col.laboració LIM-UPC i METEOSIM per al desenvolupament de la investigació referent a l'aplicació de la eina Coastal Hazard Wheel (CHW) en diversos països costaners d'Àfrica Occidental i CamerunMETEOSIM SL
22/03/201921/03/2020SUBCONTRATACIÓ PER A LA INSTAL.LACIÓ DE DOS CORRENTÒMETRES ADCP A LA BADIA DEL FANGAR DURANT 1,5 MESOS EN EL PRIMER SEMESTRE DEL 2019, LES DADES RECOLLIDES S'UTILITZARAN EN EL MARC DEL PROJECTE SOBREINST.RECERCA I TECNOLOGI.AGROALIMEN
01/03/201901/02/2023BICISENDAS. Carril BICI: sostenible, energéticamente autosuficiente, inteligente, descontaminante, integrado y seguroFCC CONSTRUCCION, S.A.
01/03/201928/02/2023Managed Aquifer Recharge Solutions Training NetworkCommission of European Communities
01/03/201928/02/2020Execució de la segona campanya de mesures hidrodinàmiques a la Badia d’Inhambane (Moçambic) en el marc d’un projecte de col•laboració inter-universitària amb la UP-MaxixeCentre de Cooperació per al Desenvolupament , UPC
01/03/201928/02/2020Desplegament d'una xarxa LORA per a la mesura de la hidrodinàmica dels rius de la badia d'InhambaneCentre de Cooperació per al Desenvolupament , UPC
01/03/201928/02/2020Desplegament d’una xarxa LORA per a la mesura de la hidrodinàmica dels rius de la badia d’Inhambane.Centre Cooperació per al Desenvolupament
01/03/201928/02/2020Comunicación dedicada para la gestión y monitoreo del agua en zona altoandina de Perú (Fase 1)Centre Cooperació per al Desenvolupament
01/03/201928/02/2020Implementació d'una xarxa de comunicacions acadèmica a la Universidad Pedagógica de Maxixe a Moçambic.Centre Cooperació per al Desenvolupament
28/02/201928/02/2019A METHOD FOR ESTIMATING THE FRACTURED VOLUME IN A RESERVOIR DOMAIN BY INJECTING A HIGH PRESSURE FLUID
23/01/201931/05/2019El objeto del presente convenio es la asesoría científica y técnica por parte de la UPC a SENER en el desarrollo de un sistema de monitorización estructural, dando soporte a la misma en todos aquellosSENER INGENIERÍA DE SISTEMAS S.A.
14/01/201920/12/2019Estudi de la millora del drenatge superficial del jaciment arqueològic d’Els Munts, a AltafullaAgència Catalana del Patrimoni Cultural
01/01/201930/06/2024OPEN INNOVATION-RESEARCH TRANSLATION AND APPLIED KNOWLEDGE EXCHANGE IN PRACTICE THROUGH UNIVERSITY-INDUSTRY-COOPERATIONCommission of European Communities
01/01/201930/06/2022Evaluación multinivel de la vulnerabilidad sísmica y mitigación de riesgo de edificios de obra de fábrica para centros urbanos históricos resilentesAGENCIA ESTATAL DE INVESTIGACION
01/01/201930/09/2022Simulación in vivo del efecto de la pioxia y la dosis del fármaco en el crecimiento del glioblastomaAGENCIA ESTATAL DE INVESTIGACION
01/01/201930/09/2022 Modelización y computación para una nueva generación de celdas flexo-fotovoltaicas (FlexoPVComp)AGENCIA ESTATAL DE INVESTIGACION
01/01/201930/09/2022Atenuación natural de patógenos y contaminantes orgánicos en medio poroso durante operaciones de recarga gestionada de acuíferosAGENCIA ESTATAL DE INVESTIGACION
01/01/201931/12/2021 ESTUDIO DE LAS PRESAS DE SUSQUEDA, TORÁN, PINTADO, Y GESTIÓN DE CANALES para ENDESA GEEndesa Generación, S.A.
01/01/201930/09/2022TRANSferencia y desarrollo METodológico de técnicas COmposicionales para las ciencias aplicadas y la ingenieríaAGENCIA ESTATAL DE INVESTIGACION
01/01/201931/12/2021Optimización topológica de estructuras sujetas a interacción fluido-estructura.Ministerio de Ciencia e Innovación
01/01/201930/06/2022Offshore Code Comparison CollaborationUniversitat Politècnica de Catalunya
01/01/201931/12/2021Advanced Multi-scAle moDEling of coupled mass transport for improving water management in fUel cellSMinisterio de Ciencia e Innovación
01/01/201931/12/2023FE-Modelling Task Force / Task 1: Validation of thermally induced THM effects in the rock around the FE-tunnelNational Cooperative for the Disposal of Radioactive Waste
01/01/201931/12/2019EIT Urban Mobility Start-up phaseEIT Urban Mobility
01/01/201931/12/2021Master's Degree in Urban MobilityEuropean Institute for Innovation and Technology
01/01/201931/12/2021Summer schools and team buildingEuropean Institute for Innovation and Technology
01/09/201730/06/2019Contracte de serveis per a l'assistència tècnica per a la investigació i assessorament en temes geotècnics de les infraestructures de la Generalitat de CatalunyaInfraestructures de la Generalitat de Catalunya S.A.U.
01/03/201531/10/2026Assistència tècnica per a la investigació i assessorament en temes geotècnics de la línia 9 del Metro de BarcelonaInfraestructures de la Generalitat de Catalunya S.A.U.
01/02/201431/10/2026Contracte de serveis per a l'assistència tècnica per a la investigació i assessorament en temes geotècnics de la línia 9 del Metro de Barcelona i altres grans infraestructures gestionades per Infraestructures de la Generalitat de Catalunya, SAU. Clau: AT.TM-00509Infraestructures de la Generalitat de Catalunya S.A.U.
04/01/201418/04/2024Automatic Classification of Digital Images of Peripheral Blood: Application to the Initial Diagnosis of Leukemias and LymphomasFundación GOTEO
01/12/201231/10/2026Contracte de serveis per a l'assistència tècnica per a la investigació i assessorament en temes geotècnics de la línia 9 del Metro de Barcelona i altres grans infraestructures gestionades per Infraestructures de la Generalitat de Catalunya, SAU (AT.TM-00509)Infraestructures de la Generalitat de Catalunya , S.A.U.
01/09/201131/10/2026Assistència tècnica per a la investigació i assessorament en temes geotècnics de la Línia 9 del Metro de Barcelona i altres grans infraestructures gestionades per GISA (Clau: AT.TM-00509)Gestió d'Infrastructures, S.A
01/08/201031/10/2026Contracte de serveis per a I'assistència tècnica per a la investigació i assessorament en temes geotècnics de la Línia 9 del Metro de Barcelona i altres grans infraestructures gestionades per GISA. Clau: TM-00509Gestió d'Infrastructures, S.A
24/07/200930/11/2024Desarrollo de un programa de control de la calidad del agua en zonas portuarias mediante simulacion numerica y observacionesORG.PÚBLICO PUERTOS DEL ESTADO
01/03/200831/10/2026Estudi per a la investigació i assessorament en temes geotècnics de la Línia 9 del Metro de Barcelona i altres grans infraestructures gestionades per GISA. Clau: E23-TM-00509Gestió d'Infrastructures, S.A

Quality

The Validation, Monitoring, Modification and Accreditation Framework (VSMA Framework) for official degrees ties the quality assurance processes (validation, monitoring, modification and accreditation) carried out over the lifetime of a course to two objectives—the goal of establishing coherent links between these processes, and that of achieving greater efficiency in their management—all with the overarching aim of improving programmes.

Validation

Monitoring

Accreditation

    Registry of Universities, Centers and Degrees (RUCT)

    Indicators